background image

19562-4-0610

Page 11

Be sure to deburr the ends with a file after cutting. Installation is 

easy after cutting the wall opening secure the vent terminal box 

in place using the (4) 10 x 1" hex-head screws provided. Locate 

the  box  so  that  the  middle  exhaust  tube  is  directed  toward  the 

furnace exhaust outlet opening. See Figure 8. Attach the black 2" 

flexible inlet air hose to the bottom 2" connector on the vent box 

using a hose clamp.  Secure the other end to the lower inlet air 

box connector using the hose clamp. Do not kink hose. Attach the 

long straight end of the 2" orange silicone exhaust elbow to the 

middle vent terminal tube and rotate the elbow toward the furnace 

exhaust outlet. Secure the hose to the vent box using a hose clamp. 

Carefully push the furnace back closer to the wall and secure the 

exhaust elbow to the 2" exhaust tube exiting the unit. Secure the 

elbow in place using the last remaining hose clamp. The furnace 

can now be secured to the wall.
The furnace can be vented with up to a maximum length of 15' 

(4.6m) including termination vent and using  2 - 90° elbows.   Also, 

the furnace can be vented with up to a maximum length of 10' 

(3m) including termination vent and using 3 - 90° elbows.     For 

longer vent lengths order the vent kit, Part Number DVE-1 and 

DVE-2.  See Figures 11 and 12 illustrating extended vent run and 

venting options.                  

Note:

  If the extended vent kit is used and the exhaust vent pipe 

is run through a cold space, such as an attic or a garage, the pipe 

should be insulated using 1/2" (13mm) thick fiberglass insulation 

or  equivalent  to  keep  the  flue  products  warm  enough  to  avoid  

condensation.  Also, slope 1/4" (6mm) per foot (305mm) the vent 

terminal horizontal run downward toward the outside of the house 

to  assure  any  condensate  flow  out  of  vent  system.  Horizontal 

vent pipe runs of 5 feet (1.5m) or more in length may accumulate 

condensation in the exhaust pipe and must, therefore, be sloped 

downward to drain any condensate out of the end vent terminal.  

Use straps or other suitable supports spaced every 5 feet (1.5m) to 

adequately hold pipe.  Be sure to avoid any low spots or sags in 

pipe run.  Be sure all connections are tight using the hose clamps 

as shown in Figure 9, "Vent Coupling Connections."
For wall depths thicker than 10" (254mm) order the extended vent 

terminal  kit  which  will  cover  walls  to  32"  (813mm)  thickness.  

The vent pipes must be cut to length to assemble for desired wall 

thickness.
For extended venting, it is also acceptable to use 2" (51mm) diameter 

PVC or ABS pipe for the 

combustion air intake supply 

piping 

only 

to the unit.  If this is used, the pipe and fittings must conform 

to ANSI and ASTM Standards D1785 for SCH. 40 PVC, D2665 

for PVC-DWV, D2241 for SDR-21 and SDR-26 PVC, D2661 for 

ABS-DWV and F628 for SCH. 40 ABS.  Pipe cement and primer 

must be used and conform to ASTM Standard D2564 for PVC or 

D2235 for ABS.  

This PVC or ABS pipe must not be used for 

the exhaust vent pipe run.

Note:  Type SDR pipe is not approved for use in Canada.

For  new  construction  installation,  the  intake  and  exhaust  vent 

can be run inside a wall, a vertical or horizontal distance prior to 

exiting the wall.  This can be done but not the preferred method of 

installation due to the inability to perform periodic inspection of 

the vent system.  In doing this, it is important to securely seal the 

vent system and slope all horizontal runs downward 1/4" (6mm) 

per foot (305mm) toward the vent terminal outside to drain out 

any condensate.  It is also necessary to adequately support both the 

exhaust and intake and to center the exhaust pipe in the wall.  
Be sure to consult local codes prior to installation to verify allowable 

procedures.

Installation of Shroud

To complete inside installation, secure furnace to the wall bracket 

by attaching the two wall mounting brackets to the wall bracket 

by using (2) 10 x 1/2" (13mm) hex-head screws provided (See 

Figures 4 and 6).  To attach the right shroud and left shroud to the 

casing back, the 3/4" wide flange on the shroud must be positioned 

toward the casing side. When positioned correctly, the (6) louvers 

on the shroud will be facing up and the knock-out on the shroud 

will be facing down. Attach the right shroud and left shroud to the 

casing back with (3) 10x1/2" hex-head screws supplied in hardware 

package, for each shroud. Attach top shroud to right shroud and 

left shroud with (4) Phillips-head screws, supplied in hardware 

package. Insert air filter into top shroud.

Attention:

 If the right shroud and left shroud are installed incorrectly, 

with the 3/4" wide flanges facing inward, the top shroud will not 

be able to be installed onto the side shrouds. The top shroud will 

appear to be 2 inches, too narrow. 

Vent Terminal (Figure 10)

Place the 6 3/8" x 6 3/8" (162mm x 162mm) black foam, wall plate 

gasket within the mounting plate.  The 4  3/4" (121mm) diameter 

hole in the black foam gasket will allow for installation of the 

concentric vent tube assembly. Slide the outside mounting plate into 

place on the concentric vent tube assembly. The outside mounting 

plate should seal against the face of the building and be secured 

in place using (4) 10 x 1" hex-head screws.  Be sure to caulk and 

seal around the pipe on the exterior using high temperature exterior 

grade, silicone caulk rated at 204°C/400°F.  Wipe some silicone 

sealant on the 2" (51mm) exhaust pipe extension. The end cap can 

be pushed into place on the exhaust outlet tube.  

Attention: 

The opening on the bottom of the end cap must be 

positioned toward the ground. The opening on the bottom cannot 

be  pivoted  to  the  right  or  left,  it  must  be  centered  toward  the 

ground.

Figure 10

NO. 10 X 1 1/2"

SCREWS (4)

INLET AIR

EXHAUST

AIR

12"(305mm)MIN.

ABOVE GRADE

CAULK AROUND PIPE

EXHAUST FITTING-SLIDE ONTO

2" EXHAUST TUBE AND USE RTV

SEALANT TO SECURE IN PLACE

WITH OUTLET POINTED DOWN

AS SHOWN

FURNACE INSTALLATION (continued)

Содержание DV-20E-5

Страница 1: ... Series in Canada This appliance is only for use with the type s of gas indicated on the rating plate A conver sion kit is supplied with the appliance Installer Leave this manual with the appli ance Consumer Retain this manual for future refer ence Do not store or use gasoline or other flamma ble vapors and liquids in the vicinity of this or any other appliance WHAT TO DO IF YOU SMELL GAS Do not t...

Страница 2: ...nts for Massachusetts 5 Introduction 6 Specifications 6 Gas Supply 7 Gas Conversion Instructions 8 Clearances 9 Furnace Installation 9 12 Lighting Instructions 13 Wiring 14 Maintenance 15 Operation and Troubleshooting 15 16 How to Order Repair Parts 16 Parts List 17 Parts View 18 Service Notes 19 TABLE OF CONTENTS ...

Страница 3: ...n and repair should be done by a qualified service person The appliance should be inspected before use and at least annually by a qualified service person More frequent cleaning may be required due to excessive lint from carpeting bedding materials etc It is imperative that control compartments burners and circulating air passageways of the appliance be kept clean Do not put anything around the fu...

Страница 4: ...lot lights perform service or make adjustments in an area where the conditions are such that you may not detect the odor if there has been a leak of LP Gas Odor fade due to oxidation by rust or adsorption on walls of new cylinders and tanks is possible Therefore people should be particularly alert and careful when new tanks or cylinders are placed in service Odor fade can occur in new tanks or rei...

Страница 5: ...requiredinaccordance with the above provisions shall comply with NFPA 720 and be ANSI UL 2034 listed and IAS certified 3 SIGNAGE Ametalorplasticidentificationplateshallbe permanently mounted to the exterior of the building at a minimum height of eight 8 feet above grade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment The sign sh...

Страница 6: ...firm corporationorcompanywhicheitherin person or through a representative is engaged in and is responsible for a the installation or replacement of gas piping or b the connection installation repair or servicing of equipment who is experienced in such work familiar with all precautions required and has complied with all the requirements of the authority having jurisdiction State of Massachusetts T...

Страница 7: ...apped or plugged for pressure test Never pressure test with appliance connected control valve will sustain damage A gas valve and ground joint union should be installed in the gas line upstream of the gas control to aid in servicing It is required by the National Fuel Gas Code that a drip line be installed near the gas inlet This should consist of a vertical length of pipe tee connected into the g...

Страница 8: ... gas conversion label are provided in conversion kit attached to manifold pipe 1 Make sure gas supply to furnace is off prior to conversion and disconnect electrical power to unit 2 Open brass union located between the gas valve and burner box Re move the 4 mounting screws securing manifold plate to the burner box Remove the top 2 screws holding the burner box top in place and then remove the 1 sc...

Страница 9: ...ould be a minimum horizontal distant of six 6 feet 1 83m from any pressure regulator In case of regulator malfunction the six 6 feet 1 83m distance will reduce the chance of gas entering the vent cap Installation on Rugs and Tile If this appliance is to be installed directly on carpeting tile or other combustible material other than wood flooring the appliance shall be installed on a metal or wood...

Страница 10: ...it is vented directly out the back using the concentric vent tube assembly provided See Figure 2 for vent hole location This hole location can be conveniently moved closer to unit exhaust outlet tube to avoid wall stud interference if necessary The orange silicone exhaust elbow would need to be cut to length Do not locateventdirectlybehindtheexhaustoutlet Donotusetheorange silicone elbow for exten...

Страница 11: ...d and conform to ASTM Standard D2564 for PVC or D2235 for ABS This PVC or ABS pipe must not be used for the exhaust vent pipe run Note Type SDR pipe is not approved for use in Canada For new construction installation the intake and exhaust vent can be run inside a wall a vertical or horizontal distance prior to exiting the wall This can be done but not the preferred method of installation due to t...

Страница 12: ...he condensate drain pan located within the appliance Whenever a horizontal vent run is used where local codes allow you can slope the exhaust pipe downward to the outside 1 4 6mm per foot 305mm The downward slope on the exhaust pipe will allow any condensate to flow out of the exhaust pipe If local codes prohibit condensate from draining to the outside and the appliance produces condensate you mus...

Страница 13: ... appliance and to replace any part of the control system and any gas control which has been under water 1 Stop Read the safety information above 2 Set the thermostat to lowest setting 3 Turn off all electric power to the appliance 4 This appliance is equipped with an ignition device which automatically lights the burner Do not try to light the burner by hand 5 Remove control access panel front pan...

Страница 14: ...installed turn off gas supply and electric supply 2 Remove casing front 3 Remove black hose from front nipple on pressure switch 4 Remove junction box cover 4 screws 5 Please refer to wiring diagram for removal of the following wires 6 Internal Electronic Thermostat Temperature Control Board Attention No 24 volt wall thermostat wires are to be at tached to the internal electronic thermostat 7 Cont...

Страница 15: ...and then turn temperature control knob clockwise slowly till furnace turns on For typical room comfort the control knob should be pointed toward medium 2 The furnace control board follows sequence of operation which allows for self diagnosis in the event there is a problem The control then blinks a status light a set number of blinks based on what problem has been encountered When the furnace is o...

Страница 16: ... of Incoming Power Leads Rapid Flash Flame sense or internal control fault Check Ignitor Operation Check Flame Sensor for Malfunction or False Grounding Check Gas Valve Reset Thermostat Note If the hot surface ignitor is to be replaced be sure to disconnect all power to the unit Be very careful in handling the new ignitor as they are fragile and can be broken easily if hit or dropped Parts can be ...

Страница 17: ...ASSEMBLY DV 20E 33 15784 EXCHANGER ASSEMBLY DV 40E 34 27523 IGNITOR KIT 37 R 2543 FLAME SENSOR 38 R 2541 BURNER 2 REQUIRED ON DV 40E 5 39 R 2575 FLAME ROLLOUT SWITCH 40 DV 1038 BURNER COMPARTMENT ACCESS PANEL 41 DV 1039 BURNER COMPARTMENT 42 R 3237 GAS VALVE NAT GAS 42 R 3238 GAS VALVE LP GAS 43 DV 1366 VALVE BRACKET ASSEMBLY 44 DV 1016 MANIFOLD ASSEMBLY DV 20E 5 ONLY 44 DV 1013 MANIFOLD ASSEMBLY ...

Страница 18: ...19562 4 0610 Page 18 PARTS VIEW ...

Страница 19: ...19562 4 0610 Page 19 SERVICE NOTES ...

Страница 20: ...ms Empire Comfort Systems Inc 918 Freeburg Ave Belleville IL 62220 If you have a general question about our products please e mail us at info empirecomfort com If you have a service or repair question please contact your dealer www empirecomfort com ...

Страница 21: ... produit peut vous exposer à des matières contenues dans le carburant ou provenant de la combustion du carburant lesquelles peuvent causer la mort ou de sérieuses maladies Installateur Laissez cette notice avec l appareil Consommateur Conservez cette notice pour consultation ultériure Ne pas entreposer ni utiliser d essence ni d autres vapeurs ou liquides inflammables dans le voisnage de cet appar...

Страница 22: ...entation en Gaz 6 Les Instructions Pour La Conversion des Gaz 7 Espaces Libres 8 Installation du Radiateur 8 10 Instructions d Allumage 11 D Installation Électrique 12 Maintenance 13 Fonctionnement et Détection des Défectuosités 14 15 Façon de Commander les Pièces de Réparations 16 Listes des Pièces 16 Vue des Pièces 17 Notes de Service 18 19 LA TABLE DES MATIÈRES ...

Страница 23: ...pecté avant l usage etaumoinsunefoisparannée parunepersonnequalifiée S il y a un excès de poussière venant du tapis de la litterie etc de fréquents nettoyages seront requis Il es impératif que les compartiments de commandes les brûleurs et les passages de circulation d air de l appareil soient gardés propres Ne rien mettre autour du radiateur qui pourrait obstruer le débit de combustion et la vent...

Страница 24: ... que vous ne pouvez pas déceler l odeur du propane en cas de fuite L affaiblissement d odeur attribuable à l oxydation par la rouille ou l adsortion sur les parois des nouveaux réservoirs et bouteilles est possible Parconséquent lespersonnesdoiventêtreparticulièrement prudentes lorsque de nouveaux réservoirs ou bouteilles sont mis en service L affaiblissementd odeurpeutseproduiredanslesnouveaux ré...

Страница 25: ...e qui est en personne ou par un représentant engagéetresponsablede a l installationouleremplacement des tuyaux à gaz ou b la connexion l installation la réparation ou l entretiendel équipement quipossèdel expériencenécessaireencegenre de travail est familié avec les précautions requises et s est conformé à toutes les exigences de l autorité ayant juridiction L installation doit être conforme aux c...

Страница 26: ... savonneuse Surveiller pour la formation de bulles Si les connexions ne sont pas exposées un test de pression doit être fait Ne jamais employer une flamme pour vérifier les fuites Lors d un test de pression letuyaud arrivéedelavalvedecommandedoitêtredébranchéde l appareil et bouché Ne jamais faire un test de pression lorsque l appareil est branché la valve de commande peut être endommagée NOTE La ...

Страница 27: ...aite par un technicien d entretien qualifié Les orifices du brûleur principal et la nouvelle étiquette pour le changement des gaz sont fournis dans l ensemble de conversion qui est attaché au tuyau de gaz LES INSTRUCTIONS POUR LA CONVERSION DU GAZ NATURELAU GAZ PROPANE LP 1 Avant de faire la conversion être certain que l alimentation de gaz du radiateur est fermée et débrancher le pouvoir électriq...

Страница 28: ... les poêles à bois La protection est pour les tapis extrêmement épais et les tuiles de couleur pâle qui pourraient se décolorer AVERTISSEMENT Le point le plus près du capuchon de l évent doit être éloigné horizontalement d un minimum de 6 pieds 1 83m du ré gulateurdepression Danslecasd unmalfonctionnementdurégulateur la distance de 6 pieds 1 83m réduira la possibilité pour le gaz d entrer par le c...

Страница 29: ...ER DE LA CONDUITE RACCORDEMENTS D ÉCHAPPEMENT RACCORDEMENT DE TUYAU DE CÂBLE DE PRISE AVEC L ACCOUPLEMENT INTERNE EN MÉTAL RACCORDEMENTS D ACCOUPLEMENT DE PASSAGE PASSAGE PROLONGÉ Figure 9 Évacuation Figures 7 8 et 9 L évacuation des gaz de cet appareil est faite directement à l arrière en utilisant un ensemble de tuyau d évent concentrique fourni avec l appareil Voir Figure 1 pour l emplacement d...

Страница 30: ...ble d évent terminal allongé lequel peut servir pour des murs d une épaisseur allant jusqu à 32 813mm Tout dépend de l épaisseur du mur les tuyaux d évent doivent être coupés à la longueur désirée Pour des évents allongés il est aussi acceptable d utiliser des tuyaux PVC ou ABS de 2 51mm de diamètre mais seulement pour le tuyau d alimentation d air de combustion à l unité Si vous utilisez ceci le ...

Страница 31: ...LES DE 6FT OU PLUS EMPLOIENT Un KIT CONDENSAT De DRAIN ET S ACCROCHENT JUSQU Au COUDE D ÉCHAPPEMENT ET S ÉCOULENT DANS Le PIÈGE SOYEZ SÛR DE REMPLIR PIÈGE AVEC DE L EAU AVANT COMMENCENT VERS LE HAUT PASSAGE D ÉCHAPPEMENT CONNECTEUR DE COUDE AVEC DES COLLIERS DE LA CONDUITE TUYAU FLEXIBLE DE PRISE A VEC LE COLLIER DE LA CONDUITE MONTURE SUPÉRIEURE SUPPORT DE SUPPORT DE MUR DE PIPE DE PASSAGE ACCOUP...

Страница 32: ...Éteindre tout pouvoir électrique à l appareil 4 Cet appareil est muni d un dispositif d allumage lequel al lume automatiquement le brûleur Ne pas essayer d allumer le brûleur manuellement 5 Enlever le panneau d accès à la commande panneau avant 6 Tournerleboutondecontrôledegazdanslesensdesaiguilles d une montre à la position OFF 7 Attendre 10 minutes pour se débarrasser des gaz Après les 10 minute...

Страница 33: ...sur le manostat enlever le tuyau noir 4 Enlever le couvercle de la boîte de jonction 4 vis 5 S il vous plaît référez vous au schéma de l installation électrique pour enlever les fils suivants 6 Thermostat électronique interne Tableau de commande de température Attention Aucun fil du thermostat mural de 24 volt doit être branché au thermostat électronique interne 7 Tableau de commande A De la vis m...

Страница 34: ...notera la DEL verte un code séquentiel indiquera le problème en vous référant au guide de détection des défectuosités Si la DEL verte est en circuit mais ne clignote pas vérifiez la commande de température électronique pour voir si elle fonctionne Ceci peut être facilement fait en débranchant les 3 conducteurs de la commande de température électronique qui est située sur la plaque principale du ra...

Страница 35: ...st fermé avec la soufflante d induction arrêtée Contrôler et changer le manocontact 4 clignotements Verrouillage causé par l absence d allumage Contrôler l état de l allumeur Vérifier le bon état du support d allumeur Allumeur trop loin du brûleur Contrôler le fonctionnement du capteur de flamme absence de fausse terre Contrôler le robinet de gaz Réinitialiser le thermostat 5 clignotements L1 Neut...

Страница 36: ...areil Puis en vous référant à l illustration et à la liste des pièces déterminer le numéro de la pièce pas le numéro d index et la description de chaque pièce Soyez certain de donner toutes ces informations Numéro du modèle du radiateur Description de la pièce Numéro de série du radiateur Numéro de la pièce Sorte de Gaz Propane ou Naturel Ne pas commander les boulons les vis les rondelles ou les é...

Страница 37: ...19562 3 0610 Page 17 VUE DES PIÈCES ...

Страница 38: ...19562 3 0610 Page 18 NOTES DE SERVICE ...

Страница 39: ...19562 3 0610 Page 19 NOTES DE SERVICE ...

Страница 40: ...ms Empire Comfort Systems Inc 918 Freeburg Ave Belleville IL 62220 If you have a general question about our products please e mail us at info empirecomfort com If you have a service or repair question please contact your dealer www empirecomfort com ...

Отзывы: