background image

25476-5-0612

Page 4

STAND OFF

2 X 4

HEADER

COMBUSTIBLE

FINISHED WALL

OR MANTEL

FINISHED WITH TRIM KIT OR

NON-COMBUSTIBLE MATERIAL

AS DESIRED.

STAND OFF

2 X 4

HEADER

COMBUSTIBLE

FINISHED WALL

OR MANTEL

FINISHED WITH TRIM KIT OR

NON-COMBUSTIBLE MATERIAL

AS DESIRED.

Sidewall Clearances:

 The clearance from the inside of the firebox 

to perpendicular combustible side wall should not be less than 

6". 

See Figure 1.

Firebox Side and Back Clearances:

 The firebox outer casing side 

and back flanges are zero clearance to combustibles.

Top Framing and Finishing:

 combustible framing may rest on 

top  of  standoffs.  Combustible  finishing  materials  may  extend 

to the top standoff screws on the front edge of the outer wrap. 

See Figure 2

.

CLEARANCES

45°

6”

3”

MAX.

PERPENDICULAR
SIDE WALL

FRONT FACE (SIDE)

FIREBOX

(TOP VIEW)

COMBUSTIBLE
MATERIALS ALLOWED
IN SHADED AREAS

Figure 1

Figure 2a - Louvered Models

Figure 2b - Flush Models

Содержание VFD32FB0F-2

Страница 1: ...ireplace size requirement DO NOT INSTALL a vent free log set IN THIS FIREBOX UNLESS THIS FIREBOX MEETS THE MINIMUM DIMENSIONS REQUIRED FOR THE INSTALLATION ANSI Z21 91 Ventless Fireplace Enclosures fo...

Страница 2: ...Line Connection 9 Optional Fresh Air Kit Installation Instructions 10 12 Optional Single Speed Blower Installations Instructions 13 15 Junction Box Wiring Installation Instructions 16 Maintenance 16...

Страница 3: ...val of such component part or accessory Any such action may create a possible fire hazard Consult your local building codes Firebox Screen The firebox screen must be in place when the firebox is opera...

Страница 4: ...ustible side wall should not be less than 6 See Figure 1 Firebox Side and Back Clearances The firebox outer casing side and back flanges are zero clearance to combustibles Top Framing and Finishing Co...

Страница 5: ...t meet the clearance requirements detailed below Grate Clearance The minimum clearance between the front legs of the grate and front edge of the firebox is 2 Leave at least 36 clearance from the front...

Страница 6: ...or other combustible material other than wood flooring it should be installed on a metal or wood panel extending the full width and depth of the unit At this point you should have decided what compon...

Страница 7: ...16 J 8 3 8 8 3 8 8 3 8 8 3 8 8 3 8 8 3 8 K 5 3 4 5 3 4 5 3 4 5 3 4 5 3 4 5 3 4 L 31 13 16 36 3 16 38 3 16 31 13 16 36 3 16 38 3 16 M 63 3 8 72 3 8 76 3 8 63 3 8 72 3 8 76 3 8 N 2 11 16 2 11 16 2 11 16...

Страница 8: ...desired they can be purchased as an option Attachment is the same as the standard black hood Flush Face Models 1 On flush face models loosen the two screws A holding firebox top to face panel then sl...

Страница 9: ...s for proper hole placement After the brick panel knockout is removed the firebox wrap may have a round metal knockout that must be removed also Use a screwdriver to punch out the metal knockout Check...

Страница 10: ...ust be installed prior to or at the time of firebox installation to framing The Fresh Air kit must be installed prior to the installation of wall board or other finishing materials around the unit Har...

Страница 11: ...tside rain cap hood to the building 2 Secure the 4 dia duct to the Slide Assembly collar on the firebox with band clamps or screws installer supplied 3 Run the other end of the duct through the exteri...

Страница 12: ...PREMIUM FIREBOXES 1 2 3 PARTS LIST INDEX NO PART NO DESCRIPTION 1 29259 Outside Air Vent Assembly 2 29257 Slide Assembly 3 29263 Handle Retainer R 3580 PHILLIPS TRUSS HEAD SCREW 10 X QTY 2 R 2737 HEX...

Страница 13: ...d Control Kit should be installed to activate pow er to the Firebox and control the operation of the FBB5 Blower assembly It is recommended that installation of the wiring be performed by a qualified...

Страница 14: ...wires away from moving parts of the blower assem bly and retain wires together near the blower motor using the plastic purse clip provided 11 To complete the installation plug the power cord into the...

Страница 15: ...move fan and clean blower wheels Warning Unplugging of blower accessory will not stop the heater from cycling To turn off gas to the heater millivolt model push in gas control knob slightly and turn c...

Страница 16: ...box Install a UL listed cable clamp not supplied in the knockout hole Leave approximately 6 of wire in the junction box for connection Attach black wire to one side of the receptacle and white wire to...

Страница 17: ...14 R7051 Rod Screen Qty 2 15 R8137 Screen Curtain Qty 2 16 R8727 Hole Plug 17 25477 Blower Cover Plate 18 25490 Front Panel Flush 18 26444 Front Panel Louvered VFD32FB 0 2 SF 1 17149 Top Standoff Qty...

Страница 18: ...le Plug 17 25477 Blower Cover Plate 18 26678 Front Panel Flush 18 26679 Front Panel Louvered VFD36FB 0 2 SF 1 17247 Top Standoff Qty 2 3 10554 Framing Bracket Qty 4 5 17162 Junction Box Assembly 6 R34...

Страница 19: ...le Plug 17 25477 Blower Cover Plate 18 26689 Front Panel Flush 18 26690 Front Panel Louvered VFD42FB 0 2 SF 1 17247 Top Standoff Qty 2 3 10554 Framing Bracket Qty 4 5 17162 Junction Box Assembly 6 R34...

Страница 20: ...25476 5 0612 Page 20 PARTS VIEW 1 16 4 2 7 6 5 8 12 11 10 9 14 14 17 13 3 15 18 18...

Страница 21: ...V 1 Brick Liners Deluxe Firebox Contact dealer for all available optional liner kits Fresh Air Kit 1 2 3 Deluxe and Premium Fireboxes BVA 1 Frame Kits 3 Piece Frame Kits Black Stainless Steel or Hamme...

Страница 22: ...ss Steel finishes Contact dealer for all avail able optional louver acces sories Bottom Trim Strip Available as optional kits in Brass Hammered Pew ter and Stainless Steel finishes Contact dealer for...

Страница 23: ...st Street Hartford CT 06114 Phone 860 722 2433 Toll Free 800 243 9360 Fax 860 293 0479 Toll Free Fax 800 274 2004 Websites www fwwebb com www victormfg com Parts Heater Hearth and Grills MASTER PARTS...

Страница 24: ...ce must be installed by a qualified installer and operated in accordance with the instructions furnished with the ap pliance A bill of sale cancelled check or payment record should be kept to verify p...

Отзывы: