57
1. DESCRIZIONE DEI COMPONENTI
IT
IT
6. INSTALLATION OF THE INDOOR UNIT
Connection to the indoor unit terminal block
- Remove the electric box cover
- Insert the cable in the cable gland
All'unità esterna
Unità interna
70 mm
10 mm
10 mm
50 mm
- At the end of the instal-
lation, refit the front
panel, the air filter and
the air inlet grille
1(L) 2(N) 4(SI)
Connection cable
Gland
The coolant tube
166
53
Drainage tube connection hole
129
220
86
Cover
electric box
The refrigerant gas pipe
- Insert into the electric box
- Loosen the screws and insert the cable ends completely into
the terminal block, then tighten the screws.
.
- Pull lightly on the cable to make sure that the cables have been inserted
and secured properly.
- After connecting the cables, never forget to tighten them to the cable
gland.
- Provide to use a protection sheet for the cables exposed to the outside.
- It is recommended to set the cables with a drip-proof run in order to
avoid possible infiltrations of water in the outdoor unit.
- Combine the electrical connection cable of the two units to the refrige-
ration piping and wrap with reinforced tape, possibly alluminized.
- If the cable cannot be solid with the piping, make a suitable wall ancho-
rage by means of a cable fastener or hose clips.
Содержание X-REVO-0919D
Страница 40: ...Note...
Страница 79: ...Note...