TESTING THE MAT CIRCUIT

1.

 

Connect the Calibration Unit’s GROUND test lead to a 

 

ground point.

2.  Insert a wrist cord into the monitor’s operator jack and 

 

snap it to the parking station.  This will enable the 

 

audible alarm circuit needed for calbration verfication.

3.  Connect the included stacking snap to the Calibration 

 

Unit’s MAT test lead.  Disconnect the monitor from 

 

its mat connection and re-install the snap located 

 

underneath the LEDs to the Calibration Unit’s stacking 

 

snap.

 

NOTE: The stacking snap must be isolated from the 

 

grounded mat.

BOTTOM VIEW

Figure 7. Connecting the MAT test lead from the Monitor 

Calibration Unit to the Jewel

®

 Workstation Continuous Mini 

Monitor

4.  Rotate the Calibration Unit’s selector knob to the MAT 

 

FAIL 500M position.  The monitor’s red WORKSURFACE 

 

GROUND LED should illuminate, and the alarm should 

 

sound.

5.  Rotate the selector knob counter-clockwise to the MAT 

 

PASS 500M position.  The monitor’s green 

 

WORKSURFACE LED should illuminate.

Calibrating the Multi-Mount Continuous Monitor

The Multi-Mount Continuous Monitor is available as the 

following item number:

TESTING THE OPERATOR CIRCUIT

1.

 

Connect the Calibration Unit’s GROUND test lead to a 

 

ground point.

2.  Insert the Calibration Unit’s OPERATOR test lead into 

 

the Multi-Mount Monitor’s operator jack.

Figure 8. Connecting the OPERATOR test lead from the 

Monitor Calibration Unit to the Multi-Mount Continuous 

Monitor

3.  Start the Calibration Unit’s selector knob at the full 

 

counter-clockwise position.  When testing the operator 

 

circuit, test only the first four limits on the Calibration 

 

Unit.  Rotate the selector knob to the LOW FAIL position.  

 

The red OPERATOR GROUND LED on the monitor 

 

should illuminate, and the alarm should sound.

4.  Rotate the selector knob clockwise to the LOW LIMIT

 

position of the green pass sector.  The monitor’s green 

 

OPERATOR GROUND LED should illuminate.

5.

 

Rotate the selector knob clockwise to the HIGH PASS 

 

position at the end of the green pass sector.  The 

 

monitor’s green OPERATOR GROUND LED should 

 

remain illuminated.

6.  Rotate the selector knob clockwise to the HIGH FAIL 

 

position.  The monitor’s red OPERATOR GROUND LED 

 

should illuminate, and the alarm should sound.

7.  Disconnect the Monitor Calibration Unit from the monitor.

Brand

Item

Charleswater

99129

Содержание 50512

Страница 1: ...Procedures The Monitor Calibration Unit was specifically designed for use in calibration of Desco brand equipment The following step by step procedures will cover calibration for specific test units The procedures will not cover adjustment of the test equipment Contact our Customer Service Department for detailed information regarding adjustment of specific continuous monitors January 2014 Calibra...

Страница 2: ...ition The monitor s red MAT GROUND LED should illuminate and the alarm should sound 5 Rotate the selector knob counter clockwise to the MAT PASS 10M position The monitor s green MAT GROUND LED should illuminate TESTING THE OPERATOR CIRCUITS 1 Connect the Calibration Unit s GROUND test lead to a ground point 2 Insert the Calibration Unit s OPERATOR test lead into the satellite s OPERATOR jack Figur...

Страница 3: ...l Workstation Continuous Mini Monitor The Jewel Workstation Continuous Mini Monitor is available as the following item number TESTING THE OPERATOR CIRCUIT 1 Connect the Calibration Unit s GROUND test lead to a ground point 2 Insert the Calibration Unit s OPERATOR test lead into the Jewel Mini Monitor s OPERATOR jack Figure 6 Connecting the OPERATOR test lead from the Monitor Calibration Unit to th...

Страница 4: ...ate Calibrating the Multi Mount Continuous Monitor The Multi Mount Continuous Monitor is available as the following item number TESTING THE OPERATOR CIRCUIT 1 Connect the Calibration Unit s GROUND test lead to a ground point 2 Insert the Calibration Unit s OPERATOR test lead into the Multi Mount Monitor s operator jack Figure 8 Connecting the OPERATOR test lead from the Monitor Calibration Unit to...

Страница 5: ...0M position The monitor s green MAT GROUND LED should illuminate Calibration Required Test Equipment RLC Bridge Settings For 50 Hz Frequency 1 000 Hz 20 x 50 20th Harmonic For 60 Hz Frequency 1 020 Hz 17 x 60 17th Harmonic Set function switch to read equivalent parallel circuit Additional Required Test Equipment for MAT Resistance Measurement Megger Set V compliance 50V or less or DMM 50V power su...

Отзывы: