background image

Diagram #6

Two Pickups
Two Volumes
One Tone

245B

EMG

O

NK

BR

GND

EMG-TB-HZ INSTRUCTIONS Page 3

T

S

OUTPUT

B245 BUSS

B159A

VOLUME

250K 

T

S

OUTPUT

250K 

B160A

TONE

EMG

MASTER
  TONE

OUTPUT CABLE

NECK
VOLUME

NECK PICKUP

BRIDGE
VOLUME

BRIDGE PICKUP

****Tips and Tricks****

****Tips and Tricks****

Start your installation by:

Start your installation by:

1) Remove the strings

1) Remove the strings

2) Remove any existing Pickups and controls

2) Remove any existing Pickups and controls

    (remember the order and function of each control) 

    (remember the order and function of each control) 

3) Determine a good spot for the Pickup Buss and make sure the

3) Determine a good spot for the Pickup Buss and make sure the

    cable or wires from the selection switch will reach the Pickup Buss, 

    cable or wires from the selection switch will reach the Pickup Buss, 

4) Install the EMG Volume and Tone Controls and tighten them in.

4) Install the EMG Volume and Tone Controls and tighten them in.

5) Then install the pickups keeping any excess cable under the pickup

5) Then install the pickups keeping any excess cable under the pickup

     rather than in the control cavity.

     rather than in the control cavity.

Diagram #8

MASTER
  TONE

OUTPUT CABLE

250K 

B160A

TONE

EMG

MASTER
VOLUME

GROUND

BRIDGE P/U

NECK P/U

OUTPUT

B159A

VOLUME

250K 

6
5
4
3
2
1

Diagram #7

2 Pickups

Toggle Style Select Switch

Master Volume / Master Tone 

FROM
SWITCH

If your instrument has a selection switch:

Shown below is the EMG B245 Pickup Buss which is used for
instruments that have 2 pickups and a 3 position selection switch.
If you have a selection switch and want your installation to
remain solderless, you’ll need a B245 Buss.
Either send an e-mail to: [email protected]
or call: 800 821-1446 to get the buss. 

 

NECK PICKUP

BRIDGE PICKUP

Diagram #8a

BLACK WIRE
WITH CONNECTOR
TO STRING GROUND

BRIDGE GROUND
SEE DIAGRAM #5

Wiring the Selection Switch

4) Refer to diagrams 8 and 8a, strip the insulation from the switch wires and Insert 

     them into the GREEN Terminal Block and tighten the screws with a small screwdriver.

     The Bridge pickup to the 

BR

 Terminal 

     The Neck pickup to the 

NK

 Terminal

     The Output of the switch to the 

O

 Terminal

     If there is a ground wire coming from the switch, insert it into one of the 

     black (

GND

) terminals on the terminal block.

1) Install the Pickups and route the Pickup cables to the control cavity.

     If the cables are too long, wind up the excess and keep it under the pickup.

2) Mount the Volume and Tone controls into the body. 

    Plug both Pickup cables into the Pickup Buss (BLACK Shroud) as shown,

    

Refer to Diagram #7

 

    Bridge Pickup to 

BR IN

    Neck Pickup to 

NK IN

3) Plug a coax cable from the Pickup Buss (

OUT

) to the Master Volume

    control as shown in the diagram. 

Отзывы: