B-4
Site Supervisor Controller User Guide 2.0
No Heat Will Come On
Incorrect board and points
assignment. Check the Heat
OAT lockout temps.
Make sure that your board and points are
assigned to the correct compressors and heat
stages.
1. Log into Site Supervisor.
2. Click the Site Map icon.
3. Under
Control Status
, click
HVAC
.
4. Click
Details
.
5. If
Heat Lockout En
is enabled (set to
ON
), check that
Heat OAT LOCK
is
set to a valid setpoint (temperature)
for heat lock out.
No Cool Will Come On
Incorrect board and points
assignment. Check the Cool
OAT lockout temps.
Make sure that your board and points are
assigned to the correct compressors and heat
stages.
1. Log into Site Supervisor.
2. Click the Site Map icon.
3. Under
Control Status
, click
HVAC
.
4. Click
Details
.
5. If
Cool Lockout En
is enabled (set to
ON
), check that
Cool OAT LOCK
is
set to a valid setpoint (temperature)
for cool lock out.
SYMPTOM
POSSIBLE PROBLEM
SOLUTION
Содержание Site Supervisor
Страница 1: ...026 1800 Rev 3 02 AUG 2016 Site Supervisor Controller User Guide 2 0 ...
Страница 2: ......
Страница 13: ...Wiring Diagrams Hardware Overview 1 3 Figure 1 3 Site Supervisor 2 0 Detail ...
Страница 29: ...Wiring Examples 3 1 3 Wiring Examples Figure 3 1 Site Supervisor and MultiFlex Wiring ...
Страница 31: ...Wiring Examples 3 3 Figure 3 3 Site Supervisor and XR35CX 230V Wiring ...
Страница 33: ...Wiring Examples 3 5 Figure 3 5 Site Supervisor and XR75CX Wiring ...
Страница 35: ...Wiring Examples 3 7 Figure 3 7 Site Supervisor and XM678 Wiring ...
Страница 37: ...Wiring Examples 3 9 Figure 3 9 Site Supervisor and XEV22 Wiring ...
Страница 39: ...Wiring Examples 3 11 Figure 3 11 Site Supervisor and XEV32 Wiring ...
Страница 41: ...Wiring Examples 3 13 Figure 3 13 Site Supervisor and Thermostat Wiring ...
Страница 43: ...Wiring Examples 3 15 Figure 3 14 Site Supervisor and iPro S Wiring ...
Страница 121: ......
Страница 129: ......
Страница 135: ......
Страница 139: ......
Страница 140: ......