![Emerson Shafer ECAT Скачать руководство пользователя страница 20](http://html.mh-extra.com/html/emerson/shafer-ecat/shafer-ecat_installation-operation-and-maintenance-manual_2400794020.webp)
April 2021
Installation, Operation and Maintenance Manual
VA-DC-000-1952 Rev. 0
17
Section 4: Set-up / Start-up Procedure
Set-up / Start-up Procedure
4.7
Final Start-Up Procedure
The system should already have the pipeline gas pressure applied to the pneumatic side of the system
per Section 2.8. Verify the connections and pressure reading on Pneumatic Pressure Gauge (88).
The header lines up to Power Oil Isolation Valve (73) should be filled and purged of all air per Section 4.6.
Under normal operating conditions, the [Hand/Off/Auto] selector switch will be set to [Auto].
Refer to the Actuator and Control IOM for specific steps in operating the actuator and control in
conjunction with the ECAT hydraulic system.
4.8
Optional Instrumentation
The ECAT system can be supplied with a Hydraulic Pressure Switch (Low System Pressure) (80)
and/or Pneumatic Pressure Switch (Low Pressure) (89), Return Filter with Bypass and Indicator (66),
or Downstream Isolation Valve (91) as an option.