
67
Reference Manual
00809-0700-4001, Rev AA
Safety Instrumented Systems Requirements
May 2017
Safety Instrumented Systems Requirements
7.5
Rosemount 3051P SIS operation and maintenance
7.5.1
Proof test
The following proof tests are recommended.
All proof test procedures must be carried out by qualified personnel.
to perform a Loop Test, Analog Output Trim, or Sensor Trim. Security switch
should be in the (
) position during proof test execution and repositioned in the (
) position after
execution.
7.5.2
Simple proof test
The simple suggested proof test consists of a power cycle plus reasonability checks of the transmitter
output. Reference the FMEDA Report for percent of possible DU failures in the device.
Emerson.com/Automation-Solutions/Pressure/Rosemount-3051
look at the certificates and approvals documentation.
Required tools: Field Communicator and mA meter.
1. Bypass the safety function and take appropriate action to avoid a false trip.
2. Use HART communications to retrieve any diagnostics and take appropriate action.
3. Send a HART command to the transmitter to go to the high alarm current output and verify that the
analog current reaches that value
.
(1)
See
“Verifying alarm level” on page 21
4. Send a HART command to the transmitter to go to the low alarm current output and verify that the
analog current reaches that value.
(2)
5. Inspect the device for any leaks, visible damage, or contamination.
6. Remove the bypass and otherwise restore the normal operation.
7. Place the Security switch in the (
) position.
7.5.3
Comprehensive proof test
The comprehensive proof test consists of performing the same steps as the simple suggested proof test
but with a two point calibration of the pressure sensor in place of the reasonability check. Reference the
FMEDA Report for percent of possible DU failures in the device.
Required tools: Field Communicator and pressure calibration equipment.
1. Bypass the safety function and take appropriate action to avoid a false trip.
2. Use HART communications to retrieve any diagnostics and take appropriate action.
3. Send a HART command to the transmitter to go to the high alarm current output and verify that the
analog current reaches that value.
“Verifying alarm level” on page 21
4. Send a HART command to the transmitter to go to the low alarm current output and verify that the
analog current reaches that value.
5. Inspect the device for any leaks, visible damage or contamination.
6. Perform a two-point calibration of the sensor (see
“Trim the pressure signal” on page 48
) over the full
working range and verify the current output at each point.
1.
This tests for compliance voltage problems such as a low loop power supply voltage or increased wiring distance. This also tests for other possible failures.
2.
This tests for possible quiescent current related failures.
Содержание Rosemount 3051P
Страница 2: ......
Страница 8: ...6 Reference Manual 00809 0700 4001 Rev AA Contents May 2017 Contents ...
Страница 12: ...2 Reference Manual 00809 0700 4001 Rev AA Introduction May 2017 Introduction ...
Страница 36: ...26 Reference Manual 00809 0700 4001 Rev AA Configuration May 2017 Configuration ...
Страница 66: ...56 Reference Manual 00809 0700 4001 Rev AA Operation and Maintenance May 2017 Operation and Maintenance ...
Страница 74: ...64 Reference Manual 00809 0700 4001 Rev AA Troubleshooting May 2017 Troubleshooting ...
Страница 98: ...Product Certifications May 2017 Reference Manual 00809 0700 4001 Rev AA Product Certifications 88 ...
Страница 109: ......