14
PACSystems™ RSTi
-EP EPSCPE100 Standalone CPU Quick Start Guide
GFK-3012E
Grounding
Proper grounding of the CPE100 is essential. Use the ground terminal located on the
underside, as shown in Figure 8. Use a 16-22 AWG braided wire with lugs to connect
the ground terminal of the CPE100 to a suitable ground stud in the enclosure panel,
or to the DIN Rail. The DIN rail onto which this product will be mounted must be
grounded as per the instructions provided in the
PACSystems RSTi-
EP User’s Manual
,
GFK-2958.
Figure 8: Location of CPE100 Ground Terminal
(Underside)
Figure 9: Earth Ground
Symbol