•
If there is no power, continue with this procedure.
2.
Before inspecting the power supply wiring, disconnect the power source.
CAUTION!
If the transmitter is in a hazardous area, wait five minutes after disconnecting the
power.
3.
Ensure that the terminals, wires, and wiring compartment are clean and dry.
4.
Ensure that the power supply wires are connected to the correct terminals.
5.
Ensure that the power supply wires are making good contact, and are not clamped
to the wire insulation.
6.
Reapply power to the transmitter.
CAUTION!
If the transmitter is in a hazardous area, do not reapply power to the transmitter with
the housing cover removed. Reapplying power to the transmitter while the housing
cover is removed could cause an explosion.
7.
Test the voltage at the terminals.
If there is no power, contact Micro Motion customer service.
10.7
Check grounding
The sensor and the transmitter must be grounded.
Prerequisites
You will need:
•
Installation manual for your sensor
•
Installation manual for your transmitter (remote-mount installations only)
Procedure
Refer to the sensor and transmitter installation manuals for grounding requirements and
instructions.
10.8
Check for radio frequency interference (RFI)
Procedure
•
Use shielded cable between the output and the receiving device.
-
Terminate the shielding at the receiving device. If this is impossible, terminate
the shielding at the cable gland or conduit fitting.
Troubleshooting
Configuration and Use Manual
79
Содержание Micro Motion LNG Series
Страница 1: ...Configuration and Use Manual MMI 20032809 Rev AA February 2017 Micro Motion LNG Series Meters ...
Страница 6: ...Contents iv Micro Motion LNG Series Meters ...
Страница 8: ...Getting Started 2 Micro Motion LNG Series Meters ...
Страница 12: ...Before you begin 6 Micro Motion LNG Series Meters ...
Страница 18: ...Quick start 12 Micro Motion LNG Series Meters ...
Страница 20: ...Configuration and commissioning 14 Micro Motion LNG Series Meters ...
Страница 50: ...Configure device options and preferences 44 Micro Motion LNG Series Meters ...
Страница 56: ...Integrate the meter with the control system 50 Micro Motion LNG Series Meters ...
Страница 58: ...Complete the configuration 52 Micro Motion LNG Series Meters ...
Страница 60: ...Operations maintenance and troubleshooting 54 Micro Motion LNG Series Meters ...
Страница 73: ...D1 and D2 density calibration using ProLink III Figure 9 1 Measurement support Configuration and Use Manual 67 ...
Страница 74: ...Measurement support 68 Micro Motion LNG Series Meters ...
Страница 94: ...Using ProLink III with the transmitter 88 Micro Motion LNG Series Meters ...
Страница 98: ...Default values and ranges 92 Micro Motion LNG Series Meters ...
Страница 99: ...Default values and ranges Configuration and Use Manual 93 ...