FloBoss 107 Instruction Manual
Revised June-2017
Inputs and Outputs
4-5
Table 4-2. I/O Terminations on the CPU Module’s Optional I/O Assembly
Termination
Number
I/O Type
10
AI1+/DI1+
9
GND
– (Common)
8
AI2+/DI2+
7
AO+/DO1+
6
AO-/DO1
5
DO2+
4
DO2
3
PI1+/DI3+
2
GND
– (Common)
1
PI2+/DI4+
4.2
Installing a Module
All I/O modules for the FB107 are designed for ease of installation and
removal. They contain no user-serviceable components.
Note:
A tab on the module’s case prevents you from installing the
module incorrectly.
To install an I/O module in either the base unit or the expansion rack:
1.
Remove power from the FB107.
2.
Remove the wire channel cover.
3.
Perform one of the following:
If there is a module currently in the slot, remove that module.
Refer to
Section 4.3, Removing a Module
.
If the slot is currently empty, remove the slot cover.
4.
Ensure that the module cover (the piece with ridged edges) is closed
against the body of the module. This enables the locking mechanism
to secure the module in the slot.
5.
Insert the module in the slot on the base unit or expansion rack.
Ensure that the module is installed facing the correct direction. Gently
slide the module into place until it contacts properly with the
connectors on the backplane.
Note
:
If the module stops and does not go any further,
do not
force
the module. Remove the module and see if the pins are bent. If
the pins are bent, gently straighten the pins and re-insert the
module. The back of the module
must
connect fully with the
connectors on the backplane.
Содержание FloBoss 107
Страница 58: ...FloBoss 107 Instruction Manual 3 8 Power Connections Revised June 2017 This page is intentionally left blank ...
Страница 104: ...FloBoss 107 Instruction Manual 5 18 Communications Revised June 2017 This page is intentionally left blank ...
Страница 151: ...FloBoss 107 Instruction Manual Revised June 2017 Index I 7 This page is intentionally left blank ...