Instruction Manual
D104548X012
V200U Valve
May 2020
6
If the valve has ENVIRO‐SEAL live‐loaded packing installed, this initial re‐adjustment will probably not be required. See
ENVIRO‐SEAL Packing System for Rotary Valves instruction manual (
) for packing instructions.
Figure 3. Fisher V200U Dimensions and Required Clearances for Installation
A
B
M
GG69033-A
P
GG69042
NOTE:
STUD QUANTITY AND PLACEMENT SHOWN FOR EXAMPLE DN200 PN40 FLANGE.
1
1
Table 4. Fisher V200U Dimensions and Required Clearances for Installation
VALVE
SIZE,
DN
VALVE
SIZE,
NPS
DIMENSION
A
B
M
(1)
P
(2)
PN 10/16
PN 25/40
CL150
CL300
PN 10/16
PN 25/40
CL150
CL300
mm
80
3
100
59
225
240
204
216
- - -
- - -
- - -
- - -
100
4
116
68
250
270
223
242
103
104
99
99
150
6
160
89
310
340
274
299
- - -
- - -
- - -
- - -
200
8
200
124
355
405
324
356
188
190
188
188
250
10
240
147
410
470
375
413
(3)
253
253
242
237
Inches
80
3
3.94
2.34
8.86
9.45
8.00
8.50
- - -
- - -
- - -
- - -
100
4
4.58
2.67
9.85
10.63
8.75
9.50
4.06
4.09
3.90
3.90
150
6
6.30
3.52
12.21
13.39
10.75
11.75
- - -
- - -
- - -
- - -
200
8
7.87
4.89
13.98
15.95
12.75
14.00
7.40
7.48
7.40
7.40
250
10
9.45
5.78
16.15
18.51
14.75
16.25
(3)
9.96
9.96
9.53
9.33
1. Clearance necessary to remove the bolt.
2. Minimum internal diameter of the mating pipe or flange required for Vee-Ball clearance.
3. The NPS 10 CL300 construction requires 4 bolts per side (8 total) to be installed in blind, tapped holes on the valve body. The M value for these 1 – 8 UNC fasteners is 140 mm (5.5 inch).