background image

 

www.easyheat.com

 

Specification/Application Information 

Performance and Rating Data

Catalog Number

SR51J

SR52J

Voltage (VAC)

120

208/240/277

Nominal Power Output in Ice (W/ft) 8.0

7.0/8.0/10.0

Maximum Single Cable Length (ft)

190

381

Current Load (Amp/ft)

at 0°F (-20°C) start-up

.132

.066

at -20°F (-30°C) start-up

.147

074

Minimum Installation Temp: -40° F (-40°C)

Perform Maximum total Heater Length (ft)/Circuit Breaker Rating

20°F(-7°C)/0°F(-20°C)/-20°F(-30°C) Start-up ance and Rating Data

Catalog Number

SR51J

SR52J

15 Amp Breaker

125/115/100

250/225/205

20 Amp Breaker

170/150/135

335/300/270

30 Amp Breaker

250/225/205

500/455/405

The use of ground fault equipment protection for heating 

cable applications is required by NEC.

Table 1: Determination of Total Cable Requirements

Items

Cable Required

Roof Edge

From Table 2 based on eave  

overhang

Gutter

1 ft of cable per foot of gutter (if gut-

ter is wider than 6", use 2 traces)

Downspout

2 ft of cable per foot of downspout–

cable is looped down and back

Roof Valley

6 ft of cable per valley–loop 3' up val-

ley and back

Dormer Perimeter

1 ft of cable per foot of dormer pe-

rimeter

Table 2:  Cable Length Factors vs. Roof Overhang

Eave 

Overhang

"E"

Loop  

Height 

"H"

Length Factor 

Shingle Roof

Length Factor 

Metal Roof

12"

18"

1.9

2.5

24"

30"

2.7

3.5

36"

42"

3.6

4.5

48"

54"

4.6

5.5 

(Note 3)

Cable length required = Length Factor x Roof Length

1.  Standard shingle roof (see diagram pg. 4).

2.  Metal roof (see diagram pg. 4).

3.  Cable length calculated above does not include 

cable for gutter or downspout.

For other designs, contact representative.

Cable Sizing

The total heater cable length for deicing is determined by including all elements of the roof system that need protection. Use the following 

charts to determine the total length of cable.

Cable Control

The Easy Heat SR cable can be controlled in several  

different ways. The simplest method is to use a  standard wall switch, 

turning the switch on only when snow/ice melting is required. It is 

recommended that a pilot light also be installed to remind the user 

when the cable is energized.

It is also possible to install controls which automatically sense when 

show/ice melting is required, energizing cables accordingly. Contact 

Easy Heat for details.

Содержание EasyHeat SR Trace SR52J

Страница 1: ...peration DESCRIPTION Easy Heat s SR51J and SR52J heater cables prevent ice dam build up which can damage buildings and gutters The cables self regulating heat output provides additional benefits Lower energy consumption The cable reduces its power output as the ice and snow disappear High temperature limited The cable reduces its temperature as it warms so this minimizes the effect of heat on the ...

Страница 2: ...f cable per valley loop 3 up val ley and back Dormer Perimeter 1 ft of cable per foot of dormer pe rimeter Table 2 Cable Length Factors vs Roof Overhang Eave Overhang E Loop Height H Length Factor Shingle Roof Length Factor Metal Roof 12 18 1 9 2 5 24 30 2 7 3 5 36 42 3 6 4 5 48 54 4 6 5 5 Note 3 Cable length required Length Factor x Roof Length 1 Standard shingle roof see diagram pg 4 2 Metal roo...

Страница 3: ...ons and b the accessory or cable not having been damaged by mechanical or electrical activities unrelated to the operation of the accessory or cable A refund of your purchase price provision of replacement products repair of the accessory or cable or provision of corrected services as described above shall be your sole and exclusive remedy for a breach of this warranty THESE ARE THE SOLE AND EXCLU...

Страница 4: ...d of a downspout End of Circuit Downspout Installation E Eave overhang distance from roof edge to exterior wall face E DSH Downspout hanger Weatherproof outlet box by Installer ZH C Roof Clip 24 o c SRP Power Connection Kit Heater Cable H Loop height Typical Shingle Roof 24 W Weatherproof Outlet Box by installer Drip Loop Heater Cable W 24 peak to peak TABLE 2 H Clip gutter cable to roof cable to ...

Страница 5: ...g cable should be positioned around the perimeter and in the valleys of a flat roof The heating cable must extend into the drain or scupper to allow the melt water to exit the roof Heating cable is to be installed into drain so that it extends at least 12 inches 30 cm into a heated space Drain Slope Junction Box Cable End Seal Heating cable should be positioned around the perimeter of a flat roof ...

Отзывы: