13
© 2015 Emerson Climate Technologies, Inc. All rights reserved.
AE4-1395 R5
50% Loaded
80% Loaded
PUMPING
PUMPING
7.5 s
7.5 s
12s
3s
NOT PUMPING
NOT PUMPING
One Cycle of 15 seconds
15 seconds
Figure 1
Digital Cycle Example
Figure 2
Digital Scroll Cross Sectional View
ZPD34-ZPD54K5, ZPD61-ZPD83KC, ZPD91KC, ZPD104KCE, ZPD122KCE, and ZRD36-81KC
Note: Modulation tubing is show for reference only.
Refer to Figure 6 for the correct modulation tubing configuration.