Mapping Breaker Numbers to Board and Points (Bd:Pt)
Charts/Appendices • 9
6.1.3. Status
From the Option screen, select
1
for Status. The Status
screen shows the status of the 48 groups and shows the ON
or OFF state of each group and any proof failures (a proof
failure is indicated by "*" after the ON or OFF state). Press
the down arrow key to scroll through the groups. After the
groups are displayed, continue pressing the down arrow
key to see the ON or OFF state and any proof failures of
each of the 48 breakers and all panels.
If a group is not assigned or set to zero, a "-" will appear
as the breaker status.
7
Charts/Appendices
7.1.
Mapping Breaker Numbers
to Board and Points (Bd:Pt)
Up to a maximum of 48 groups can be set up, but there
is no limitation to the number of breakers that may belong
to a single group.
Y
represents the starting 16AI address and
X
represents
the starting 8RO address of the Gateway configured in
Sec-
tion 6.1.1.,
HHT Screens
.
Figure 6-5
- Option Screen
OPTION: 1
1= STATUS
2= DIAGS
3= CONFIG
Light
Sched-
ule
Proof
In
(Bd)
Proof
In
(Pt)
Lights
Output
(Bd)
Lights
Output
(Pt)
Group
16AI
Addr
16AI
Points
8RO
Addr
8RO
Points
1
Y
1
X
1
2
Y
2
X
2
3
Y
3
X
3
4
Y
4
X
4
5
Y
5
X
5
6
Y
6
X
6
7
Y
7
X
7
8
Y
8
X
8
9
Y
9
X+1
1
10
Y
10
X+1
2
11
Y
11
X+1
3
12
Y
12
X+1
4
13
Y
13
X+1
5
14
Y
14
X+1
6
15
Y
15
X+1
7
16
Y
16
X+1
8
17
Y+1
1
X+2
1
18
Y+1
2
X+2
2
19
Y+1
3
X+2
3
20
Y+1
4
X+2
4
21
Y+1
5
X+2
5
22
Y+1
6
X+2
6
23
Y+1
7
X+2
7
24
Y+1
8
X+2
8
Table 7-1
- Mapping Group Numbers to Point Numbers
Содержание CH Breaker Gateway
Страница 1: ...026 1710 Rev 1 05 15 07 CH Breaker Gateway Installation and Operation Manual ...
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 22: ......