July 2019
Installation, Operation and Maintenance Manual
MAN-02-01-39-0704-EN Rev. 0
Integral Proximity Switch Mounting
Section 5: Integral Proximity
Switch Mounting
(Only with Prox Prep Factory Ordered Option)
A.
Remove plastic plugs from proximity ports located on the back of the
actuator housing.
B.
Insert switch and turn clockwise until switch touches ferrous activator on yoke,
then back off approximately 1/16”.
C.
Test switch by stroking actuator and verifying make and break of switch.
D.
Repeat procedure for second switch if required.
10
Section 5: Integral Proximity Switch Mounting
Содержание Bettis M Series
Страница 29: ......