SECTION 2 TESTING & SERVICE

2--1

TRANSFER TEST

Test the Automatic Transfer Switch portion of the 7000

Series ATB at least once a month. This procedure checks

the electrical operation of the Transfer Switch and

Controller. Put the engine–generator starting control (at

the engine–generator set) in automatic mode.
In the following test the generator will start, the load will

be transferred to the Emergency source, then back to the

Normal source. An interruption to the load will occur,

unless the the Transfer Switch contacts are bypassed be-

fore the test. See page 3–1 for bypassing & isolating in-

structions if no interruption of load is required.

Be sure to close the enclosure door

before proceeding to prevent personal injury

in case of electrical system fault.

!

Perform the five–step

Electrical Operation --- Transfer

Test

procedure on page 1–7.

PREVENTIVE MAINTENANCE

Reasonable care in preventive maintenance will insure

high reliability and long life for the 7000 Series ATB. An

annual preventive maintenance program is recom-

mended.

ASCO Services, Inc. (ASI) is ASCO Power

Technologies’s national service organization. ASI

can be contacted at 1-800-800-2726 (ASCO) for in-

formation on preventive maintenance agreements.

Checklist for Yearly Inspection

Hazardous voltage capable of causing shock,

burns, or death is used in this switch.

Deenergize both Normal -- Emergency power

sources before performing inspections!

j

Clean the ATS enclosure

.

Brush and vacuum away

any excessive dust accumulation. Remove any mois-

ture with a clean cloth.

j

Check the transfer switch contact

s

. Remove

transfer switch barriers and check the condition of

the contacts. Replace contacts when pitted or worn

excessively. Reinstall the barriers carefully.

j

Maintain transfer switch lubrication

. If switch is sub-

jected to severe dust or abnormal operating conditions,

renew factory lubrication on all movements and link-

ages. Relubricate solenoid operator if TS coil is re-

placed. Don’t use oil; order

lubrication kit 75-100

.

j

Check all cable connections & retighten them

.

REPLACEMENT PARTS

Replacement parts are available in kit form. When or-

dering parts provide the Serial No., Bill of Material No.

(BOM), and Catalog No. from the transfer switch name-

plate. Contact your local ASCO Power Technolgies sales

office or ASI.

In the United States call 1--800--800--ASCO (2726)

In Canada call 1--888--234--ASCO (2726)

DISCONNECTING THE CONTROLLER

The harness disconnect plugs are furnished for repair

purposes only and should not have to be unplugged. If

the control panel must be isolated, follow these steps:

Bypass--Isolation Switch is energized!

Do not touch isolation contact fingers;

shock, burns, or death could result!

Disconnecting the Plugs

1. Bypass and Isolate the Automatic Transfer Switch.
2. Open the upper enclosure door.
3. Separate the two quick disconnect plugs by squeez-

ing the latches. Do not pull on the harness wires.

Reconnecting the Plugs

1. The ATS should be still bypassed and isolated.
2. The two harness plugs and sockets are keyed. Care-

fully align the plugs with the sockets and press

straight in until the latches click.

3. Close the enclosure doors.
4. Follow

Return to Service

instructions on page 3–3.

Содержание 7ATBC34000N5C

Страница 1: ... installation and connection details and accessories Refer to Group 5 Controller User s Guide 381333 126 for ATS status display messages time delays pickup dropout settings and adjustments Rating Label Each 7000 Series ATB contains a rating label to define the loads and fault circuit withstand closing ratings Refer to the label on the Transfer Switch for specific values Do not exceed the values on...

Страница 2: ...equired door opening space If bottom cable entry is used the foundation must be pre pared so that conduit stubs are located correctly Refer to appropriate enclosureoutline drawingfor specifiedcable entrance area and location Provide cable bending space andclearancetolivemetal parts When aconcrete flooris poured use interlocking conduit spacercaps ora woodor metal template to maintain proper condui...

Страница 3: ...ection is used use SAE grade 5 hardware to connect bus to appropriate terminal plates on bypass switching device Wipe off bus surfaces before they are joined If bus is dirty gently clean surfaces with a non flammablesolvent Avoidtouching cleanedsurfaces Do not breathe cleaning solvent vapors Use SAE grade 5 hardware and tighten the bolted joints to the torque specified in Table 2 1 The reliability...

Страница 4: ... roll it into the cabinet isolation contacts facing inward Align the rollers between the floor guides and push the carriage in until its crank pins engage the latch plates on both sides Then follow the procedure below NOTE Solenoid lock SL1 on the Isolation shaft inhibits operation of the drawout Isola tion contacts unless the Transfer Switch and Bypass Switch are in compatible positions This sole...

Страница 5: ...nterference tag in place Figure 1 2 continue slowly turning the Isolation Handle clockwise until it stops approximately 6 or 7 turns Now remove the interference tag from the solenoid latch Observe The Transfer Switch should be pulled inward the isolation contact fingers should make with the male stabs as shown in Figure 1 6 Also check that the Bypass Switch switched neutral contacts have opened Fi...

Страница 6: ...g a meter to measure voltages Do not touch power termi nals shock burns or death could result Perform steps 1 6 at the right Observe the status lights See Figures 1 8 and 1 11 Black square means light is on White square means light is off If necessary adjust voltage regulator on generator per the manufacturer s recommendations The ATB will respond only to rated voltage specified on the nameplate N...

Страница 7: ...onnect isolation contacts 2 A detachable manual operator handle is provided on the Transfer Switch for maintenance purposes only Do not manually operate the Transfer Switch unless the Isolation Handle is in the OPEN position and the DISCONNECTED light is on handle rotating weight Figure 1 10 Transfer Switch manual operator handle Figure 1 11 Status Indicator Panel Insert the manual handle into the...

Страница 8: ...solation Handle clockwise until it stops about 6 or 7 turns The CONNECTED light should come on TEST light off Remove the Isolation Handle and store it inside the enclosure on the carriage frame on the right side 4 Turn the Bypass Handle clockwise to the AUTO MATIC POS position The Bypass Switch CLOSED ON NORMAL light should go off ThiscompletestheFunctionalTestof theATB Thegenera tor s starting co...

Страница 9: ...lation Remove any mois ture with a clean cloth j Check the transfer switch contacts Remove transfer switch barriers and check the condition of the contacts Replace contacts when pitted or worn excessively Reinstall the barriers carefully j Maintain transfer switch lubrication Ifswitchissub jected to severe dust or abnormal operating conditions renew factory lubrication on all movements and link ag...

Страница 10: ...ansfer switch does not transfer the load to normal source when normal returns or when the Transfer Control switch is released Wait for Feature 3A time delay to time out Voltmeter should read at least 90 of nominal phase to phase voltage between transfer switch terminals NB NC NC NA NA NB or NL1 NL2 for 2 pole Engine generator set does not stop after load retransfer to the normal source Wait for Fe...

Страница 11: ...OLATING NOTE When Acc 66A is specified the handle operation is reversed Follow instruction on the door ISOLATING This procedure explains how to isolate the Automatic Transfer Switch Isolating is required before any service work can be performed on the ATS Observe the ATS POSITION lights on the STATUS INDICATOR panel 1 Bypass the closed Automatic Transfer Switch contacts See BYPASSING 2 Isolate the...

Страница 12: ...ng electrical shock burns or death Do not touch isolation contact fingers 1 Open the ATS cabinet doors all the way Remove the bottom louvered enclosure pan if not already removed All arc chutes and interphase barriers must be in place on the Transfer Switch The enclosure tracks and floor in front must be free of debris The Transfer Switch contacts must be closed on the same source that is feeding ...

Страница 13: ...This light indicates the source connected to the load 4 Observe which Transfer Switch CLOSED ON light is on NORMAL or EMERGENCY This light indicates the position of the Transfer Switch If it is not in the same position as the Bypass Switch change the Transfer Switch position as follows To change the position of transfer switch Operate to NORMAL Operate to EMERGENCY Turn Transfer Control switch cou...

Страница 14: ...2 manual load transfer 2 2 warning 2 2 N nameplate cover Normal Source Accepted light 1 5 O operation electrical 1 7 manual 1 6 warning 1 6 P parts 2 1 phase rotation check 1 2 preventive maintenance 2 1 problem 2 2 R rating label cover replacement parts 2 1 return to service 3 3 S service ASCO Services Inc ASI 2 1 settings see Controller User s Guide T test functional 1 5 1 6 1 7 testing power ca...

Отзывы: