3
Initial connection and configuration
To configure the gateway, a local connection between a computer and the
gateway needs to be established.
Powering the Gateway
For the Emerson Wireless 1410S Gateway, bench top power will be needed
to power the Gateway by wiring a 10.5–30 VDC power source.
An Emerson Wireless 1410S Gateway can also be powered via Power over
Ethernet (PoE) and is compliant with the IEEE 802.3af standard.
Note
The Emerson Wireless 1410S2 Gateway hardware revision 1.0.0 configured
with Intrinsically Safe Outputs option “A” can only be powered by 24 VDC
power source. Check label to verify hardware revision.
July 2022
Quick Start Guide
Quick Start Guide
7
Содержание 1410S
Страница 1: ...Quick Start Guide 00825 0600 4410 Rev BB July 2022 Emerson Wireless 1410S Gateway ...
Страница 4: ...Quick Start Guide July 2022 4 Emerson com ...
Страница 19: ...Figure 4 1 Emerson 1410S1 Mounting July 2022 Quick Start Guide Quick Start Guide 19 ...
Страница 38: ...7 2 8 Declaration of Conformity Quick Start Guide July 2022 38 Emerson com ...
Страница 39: ...July 2022 Quick Start Guide Quick Start Guide 39 ...
Страница 40: ...Quick Start Guide July 2022 40 Emerson com ...
Страница 41: ...July 2022 Quick Start Guide Quick Start Guide 41 ...
Страница 42: ...Quick Start Guide July 2022 42 Emerson com ...
Страница 43: ...July 2022 Quick Start Guide Quick Start Guide 43 ...