EMC VPLEX with GeoSynchrony 4.1 Installation and Setup Guide
30
Installing the Hardware
c. Verify that the Power and Status LEDs (shown in
) on both Fibre
Channel switches are steady green.
Figure 18
Fibre Channel switch, rear (port side) view
9. Remove the bezel from the front of the management server.
10. On the front of the management server (
), verify that the power LED is
illuminated.
If the LED is not on, press the power button.
Figure 19
Management server power button and LEDs
11. Replace the management server bezel.
Zep-034
Stat
u
s LED
Power LED
Zep-015
Power LED
Power b
u
tton
Содержание VPLEX
Страница 8: ...EMC VPLEX with GeoSynchrony 4 1 Installation and Setup Guide 8 Tables...
Страница 20: ...EMC VPLEX with GeoSynchrony 4 1 Installation and Setup Guide 20 Introduction...
Страница 76: ...EMC VPLEX with GeoSynchrony 4 1 Installation and Setup Guide 76 Setting up VPLEX...
Страница 92: ...EMC VPLEX with GeoSynchrony 4 1 Installation and Setup Guide 92 Reference...
Страница 94: ...EMC VPLEX with GeoSynchrony 4 1 Installation and Setup Guide 94 Index...