Installing a cluster
27
Installing the Hardware
Figure 12
WAN cable routing on cable holders
Task 7: Power the
components ON
1. Verify that all PDP switches and PDU circuit breakers (shown in
) are in the OFF position. As the figure notes, the upper pair of PDUs are
installed upside-down from the lower pair, and the upper PDPs are not used.
2. Complete the
EMC AC Power Configuration Worksheet
and place it in a convenient
location, for use in verifying the data center power schemes.
3. Connect the main AC power cables from the lower PDPs into the site’s power
sources. To ensure high availability, each cable must connect to a different power
source, as described in the
EMC Best Practices Guide for AC Power Connections in
Two-PDP Bays
.
zep-070a
0
1
2
3
0
1
2
3
0
1
2
3
0
1
2
3
0
1
2
3
0
1
2
3
I/O Mod
u
le A4
0
1
2
3
0
1
2
3
1
2
0
Detail
Separate wires
aro
u
nd posts
Remove cap to ro
u
te
cables, and then
replace cap
3
Ro
u
te cables from ports A4-FC02
and B4-FC02 to B side
Ro
u
te cables from ports
A4-FC03 and B4-FC03 to A side
Содержание VPLEX
Страница 8: ...EMC VPLEX with GeoSynchrony 4 1 Installation and Setup Guide 8 Tables...
Страница 20: ...EMC VPLEX with GeoSynchrony 4 1 Installation and Setup Guide 20 Introduction...
Страница 76: ...EMC VPLEX with GeoSynchrony 4 1 Installation and Setup Guide 76 Setting up VPLEX...
Страница 92: ...EMC VPLEX with GeoSynchrony 4 1 Installation and Setup Guide 92 Reference...
Страница 94: ...EMC VPLEX with GeoSynchrony 4 1 Installation and Setup Guide 94 Index...