20
Install - Step 1 continued
Install the storage-system hardware
c. Secure the front of the enclosure to the front vertical channels of the cabinet
using four M5 12.7 mm screws (two per side), as shown below.
Securing the enclosure to the cabinet
d. Install the bezel
4. Repeat step 3 to install additional DAEs in the cabinet above the DAE-OS.
I
f your system will include enterprise flash drives (solid state disk drives with flash memory,
or
SSD
drives), be sure to carefully plan your configuration using the
Best Practices, Applied
Technology, and planning documentation available on EMC Powerlink:
Home
>
Products
>
Hardware/Platforms
>
CLARiiON CX4 Series
>
White Papers
.
EMC3491
Screw (2)
Screw (2)
Rear
Front