
2
TABLE OF CONTENTS
WARRANTY ............................................................. 4
PRE-DELIVERY PROCEDURE ............................... 5
SERIAL NUMBER LOCATION ................................ 6
LABELLING INFORMATION ................................... 6
1 INTRODUCTION ......................................... 7
2 SAFETY ...................................................... 8
SAFETY DO'S & DON'TS' ....................... 9
EQUIPMENT SAFETY GUIDELINES .... 10
SAFETY TRAINING ................................11
2.4 PREPARATION ...................................... 12
2.5
MAINTENANCE SAFETY ...................... 13
OPERATING SAFETY ........................... 14
TRANSPORT SAFETY .......................... 15
HYDRAULIC SAFETY ........................... 15
GAS MOTOR SAFETY .......................... 16
2.10 REFUELLING SAFETY ......................... 17
2.11 TIRE SAFETY ........................................ 17
2.12 STORAGE SAFETY............................... 17
2.13 FEED ROLLER SAFETY ....................... 17
2.14 BATTERY SAFETY ................................ 17
2.15 SIGN-OFF FORM .................................. 18
SAFETY SIGNS ........................................ 19
HOW TO INSTALL SAFETY SIGNS: ..... 19
SAFETY SIGN EXPLANATIONS: .......... 19
SAFETY SIGN LOCATIONS .................. 20
4 FEATURES ............................................... 21
OR OWNER ........................................... 21
......................................... 21
MACHINE COMPONENTS .................... 22
4.2.1 COMPONENT VIEW 1 .......................... 22
4.2.2 COMPONENT VIEW 2 .......................... 23
4.3 CONTROLS ........................................... 24
4.3.1 ENGINE KOHLER CH980 38HP ........... 24
4.4
PROGRAMMING: .................................. 25
4.4.1 INTELLIFEED FEATURES ................25
4.4.2 INTELLIFEED PROGRAMMING: ......26
4.5
DISCHARGE CHUTE: .......................27
HOOD DEFLECTOR: ........................27
"EASY START" .................................27
ROLLER FEED CONTROL BAR: ......28
OPERATION & PROCEDURE .............29
5.1 PREPARE ..........................................29
5.2
MACHINE BREAK-IN ........................30
PREOPERATION CHECKLIST..........30
TRAILER / TOW VEHICLE ................31
5.4.1 BALL & COUPLING ...........................31
5.4.2 PINTLE HITCH ..................................32
5.5
MACHINE SET-UP ............................33
STARTING PROCEDURE .................34
5.6.1 STOPPING PROCEDURE: ...............34
5.6.2 EMERGENCY STOPPING ................34
5.7
FLUID COUPLING .............................35
5.7.2 RESET THE SAFETY: .......................35
5.8
PROCEDURE ....................................36
5.8.1 INTERLOCK PROCEDURE: .............36
5.8.2 OPEN ROTOR HOOD: ......................37
5.9
PROCEDURE ....................................38
5.10 CHIPPING OPERATION ....................39
5.10.1 UNPLUGGING: ..................................40
5.10.2 SEVERE PLUG: .................................40
5.11 REFUELLING: ...................................41
5.12 OPERATING HINTS: .........................41
6 TRANSPORTING .................................42
PREPARE FOR TRANSPORT: ..........42
STOW THE FEED TABLE: ................43
7 STORAGE ............................................44
Содержание Wallenstein CR Series
Страница 69: ...69 ...