6. Commissioning

6.1. Filling/venting

The ELYSATOR® can be filled with demineralised water via the drain valve. 

To do so, the air vent on the appliance must be unscrewed. The two shut-

off valves must be closed. During the filling process, press on the air valve 

on the air vent connection. Once water starts to come out of the top of the 

ELYSATOR®, the air vent can be screwed back on and the shut-off valves 

opened. It is also possible to fill the entire system by expelling the air.

6.2. Setting the throughput

Set the throughput according to the values in the chart in chapter 4.3. 

A.  On indicator (1), mark the reference value for setting the valve.

B.  Pull ring (2) to open the slide valve that blocks the throughput of fluid 

through flow meter (3) during normal operating conditions.

C.  Hold the slide valve open and use a special spanner to make the 

adjustment on valve regulating spindle (4). The reading is indicated by 

metal ball (5) in l/min on a measuring scale on transparent cylinder (6).

D.  After completing the adjustment, release ring (2) of the flow meter slide 

valve. An integral spring automatically returns the slide valve to the closed 

position.

Содержание 100c

Страница 1: ...www elysator com Installation Function Operation Service Operating instructions ELYSATOR Typ 50c 100c...

Страница 2: ......

Страница 3: ...onnection 8 6 Commissioning 6 1 Filling venting 9 6 2 Setting the throughput 9 7 Operation 7 1 System water 10 7 2 Checking the condition of the anodes 10 8 Maintenance 8 1 Interpreting the indicator...

Страница 4: ...4 1 Safety instructions Not drinking water Maximum 100 C Maximum 10 bar pressure 10 bar...

Страница 5: ...functions are combined into one appliance pH regulation by means of a sacrificial anode Micro gas bubble separator Magnetic flow filter 3 Standard delivery 2 plug 1 red brass 2 twin connector 1 3 4 r...

Страница 6: ...th insulation 2 Indicator 3 Drain valve 4 Vent valve with gasket and coupling 5 Elbow 2x 6 Line regulating valve 7 Shut off valve 2x 8 Coupling 9 Magnet 10 Cover plate 2 part 11 Input 1 2x 12 Output 1...

Страница 7: ...E Cylinder diameter 420 mm F Cylinder height 685 mm G Flange diameter 140 mm Input output connection 1 inside thread Drain connection 1 inside thread 4 3 Performance data ELYSATOR Typ 50c ELYSATOR Ty...

Страница 8: ...arated out efficiently an installation position close to the diffusion point underfloor heating should be selected The appliances in the ELYSATOR industrial series are designed for installation in a s...

Страница 9: ...g the air 6 2 Setting the throughput Set the throughput according to the values in the chart in chapter 4 3 A On indicator 1 mark the reference value for setting the valve B Pull ring 2 to open the sl...

Страница 10: ...During operation the ELYSATOR function must be checked every 6 months This is shown on the wear indicator on the duct As long as the wear indicator is in the green zone the anode is operating normally...

Страница 11: ...OR and fill it with tap water If after one day with the shut off valves closed the wear indicator reads a higher value than before then the system is OK The ELYSATOR can then be re filled with deminer...

Страница 12: ...9 7 Open the drain valve if blocked use a screwdriver or wire to clear it 8 Release the vacuum by pressing on the air valve on air vent connection 4 9 Connect drain 3 to the fresh water supply 10 Fill...

Страница 13: ...a size 10 open ended spanner 9 Slide the anodes out from the anode tree 10 Slide new anodes into the anode tree 11 Screw new anodes onto the isolating screw 12 Insert new flange gasket 6 13 Insert the...

Страница 14: ...anode 8 5 Replacing the wear indicator and the control button Fig 7 3 1 Remove top cover panels 10 2 Remove contact blade 3 from the blade terminal 3 Loosen flange screw 4 with cable connection 4 Rem...

Страница 15: ......

Страница 16: ...Service booklet Installer Date of installation Project Device no Sludge removal interval Maintenance interval Date Job Meter mA Company signature...

Отзывы: