Page 3 of 4
8.Place Second Floor Wall against Second Floor
ensuring bottom edges are flush. Secure with two
Wood Screws.
11. Repeat step 10 for remaining three corners.
8. Secure opposite Second Floor Wall to other side
of Second Floor as in step 8 using two Wood Screws.
10. Align False Beam angled end with edge of Side
Wall and False Beam Bottom with upper of edge
Side Wall top groove. Secure with two Wood Screws.
9. Center Top Doorway with pre-drilled holes in
middle of Second Floor Walls and secure with two
Wood Screws.
12. Center Gable End on top of Side Wall ensuring
side of Gable End and Sided Wall are flush. Secure
with four Wood Screws.
13. Repeat step 12 to attach opposite Gable End to
Side Wall.
14. Place Back Roof into Front Roof groove ensuring
ends are flush. Place assembly onto Gable Ends en-
suring Gable Ends set into Roof assembly grooves.