Packing List
•
Screen fabric
•
Screen fabric case
•
2 folding legs
•
1 screen frame
•
Aluminium storage box
•
Hand screws
Assembly Notes
•
Clear a space on the floor large enough for screen assembly.
•
Ensure you know which side of the projection screen is the front and which is the
back. This can be distinguished by the card which is on the corner of the fabric
screen or in the bag
•
See Figure 1 for front projection and Figure 2 for rear view projection.
Assembly Instructions
1. Take the frame out of the box and
place it on a flat surface. First check
that the snaps are on top and if so,
proceed to unfold the longer sections
first.
2. Unfold the frame until the latch on
the hinge “clicks” into place. Repeat the
procedure for the shorter sections.
3. Make sure all 4 corners of the frame
are at 90° and that the hinged support
bar is straight and not bent.
If your screen has a 20
0” or greater
diagonal, the frame will come in 2
parts. Attach the upper frame to the
lower frame and fasten 2 frames with
M8×16 screws.
4. Take the screen fabric out of the bag
and put it inside the frame next to the
corner. Unfold as shown in the
diagram.