background image

Packing List  

 

Screen fabric  

 

Screen fabric case  

 

2 folding legs  

 

1 screen frame  

 

Aluminium storage box 

 

Hand screws 

 Assembly Notes  

 

Clear a space on the floor large enough for screen assembly.  

 

Ensure you know which side of the projection screen is the front and which is the 
back. This can be distinguished by the card which is on the corner of the fabric 
screen or in the bag 

 

See Figure 1 for front projection and Figure 2 for rear view projection.  

 

Assembly Instructions 

1. Take the frame out of the box and 
place it on a flat surface. First check 
that the snaps are on top and if so, 
proceed to unfold the longer sections 
first. 

 

 

 
 
 
2. Unfold the frame until the latch on 

the hinge “clicks” into place. Repeat the 

procedure for the shorter sections. 
 
 
 

 

 

 
 
3. Make sure all 4 corners of the frame 
are at 90° and that the hinged support 
bar is straight and not bent. 
 
 

 

 

 
 
If your screen has a 20

0” or greater 

diagonal, the frame will come in 2 
parts. Attach the upper frame to the 
lower frame and fasten 2 frames with 
M8×16 screws. 
 
 

 

 

4. Take the screen fabric out of the bag 
and put it inside the frame next to the 
corner. Unfold as shown in the 
diagram. 

 

 

Отзывы: