background image

5. Once the screen fabric is fully 
unfolded, secure it to the frame with 
the snaps. Secure the snaps starting 
from the corners and working towards 
the middles. Secure the shorter side 
before the longer side. 

 

 

 
 
 
6. Take the folding legs out of the box 
and unfold as shown. Make sure the 
hinges click into place. 
 
 
 

 

 

If the diagonal of your screen is 20

0” or 

greater, use the hand screws to secure 
the support leg to the vertical leg in an 
appropriate position. The support leg 
can be adjusted to an appropriate 
length. If the frame is attached to the 
legs higher up than the support leg, the 
support leg should also be attached 
higher up. 

 

 

 

 
 
7. Lay the frame on the floor and 
position the legs over the sides of the 
frame at the desired height. Use the 
hand screws to loosely attach the 
frame. Repeat with the other leg and 
when in the desired position, proceed 
tightening both sides firmly. 
 
 

 

 

8. When the frame is in the vertical 
position, fold the front facing feet of 
the legs out. Assembly is completed 
and the projection screen will be stable 
on a flat surface. 

 

 

 
9. After using the screen, disassemble 
the screen and store it in the box 
provided. To disassemble the screen, 
implement the assembly procedure in 
reverse order. 
 

 

 

 

Отзывы: