9.

 

Startup Checklists 

This  section  includes  basic  checklists  to  assist  the  user  in  verifying  proper 
installation and starting system operation. 

Pre-Start Check 

 

 

 

 

 

         Power is OFF 

CHECK THE FOLLOWING POINTS

OK

 

1.

 

Flatpack2 system installation is completed; The 

Flatpack2 Installation Check List

 is filled in. 

 

All cabling is securely terminated with 

correct polarity

 

 

2.

 

All battery and load Breakers / fuses are disconnected 

 

3.

 

AC input cable(s) and AC earth wire (Ground) are terminated 

 

4.

 

Site specific parameters and settings are known 

 

5.

 

AC supply and all Breakers / fuses are switched OFF 

 

 

Start-up, No-Load & Load Adjustments 

 

 

Power is ON 

CARRY OUT FOLLOWING

OK

 

1. 

Install all rectifier modules in desired locations 

 

2. 

Verify AC input voltage is correct;  

Measure and verify 

 

3. 

Switch ON the external AC feeds 

 

4. 

Verify all rectifier modules are working, Green power LEDs are ON  

Verify 

 

5. 

Verify The 

Smartpack 

is functioning Green power LED is ON  

Verify 

 

6. 

Connect a PC to the PS system 

Install the 

PowerSuite

 software, if required 

 

7. 

Verify DC output voltage;  

Measure and adjust as needed 

 

8. 

Measure battery voltage, confirm level, and close disconnect if present  Verify correct 

polarity! 

 

9. 

Verify System Setup is in accordance with desired configuration  

Enter site spec. 
info in 

PowerSuite

 

 

10. 

Connect all load Breakers / fuses, and verify no alarms are displayed 

 

11. 

  Verify the rectifiers output current, and load function 

 

12. 

Verify System Alarm Setup is in accordance with desired configuration   Configure alarm 

mapping in 
PowerSuite 

 

13. 

Use PowerSuite to simulate Alarm Relay conditions  

Verify all alarm 
relays are 
working correctly 

 

14. 

This completes the basic system start-up and configuration 

 

Содержание Flatpack2

Страница 1: ...2029242 R2 Installation Guide Flatpack2 48V 150A DC Power Systems Flatpack2 Power System ...

Страница 2: ...ocument may be reproduced or transmitted in any form or by any means electronic or mechanical including photocopying and recording for any purpose without the explicit written permission of Eltek Valere Copyright 2008 Eltek Valere 1303 E Arapaho Rd Richardson TX 75081 USA Phone 1 469 330 9100 Fax 1 469 330 9101 Technical Support 1 866 240 6614 www eltekvalere com 2029242 R2 May 2008 Published 30 M...

Страница 3: ...lectrical Installation 10 Individual Feed 11 Dual Feed 11 5 Module Installation 12 6 Distribution 13 LVD Options 14 Central Office Ground 14 Configurations 15 Two Battery Two Load 2B 2L 15 Two Battery Two Load 12 GMT 2B 2L GMT 16 Two Battery Four Load 2B 4L 16 Four Load 12 GMT 4L GMT 17 Six Load 6L 17 Breakers and Fuses 18 Plug in Breakers 18 Plug in Fuse Holders 18 GMT Fuses 20 Battery Connection...

Страница 4: ...tion Guide Flatpack2 48V 150A 2029242 R2 May 2008 8 Controller Access 25 Controller Configurations 25 Smartpack Extended 25 Smartpack Web 25 Local Keypad Access 26 Local Computer Access 28 9 Startup Checklists 29 ...

Страница 5: ...le for the compliance could void the user s authority to operate this equipment Protecting personnel against electrical shocks The power system cabling must be done by qualified personnel in conformance with local and national electrical codes Input voltages to rectifiers are at a dangerous level Ensure that circuit breakers are locked in the OFF position at the AC service panel before attempting ...

Страница 6: ...ehr vorhanden ist Vergwissern Sie sich das alle Schalter an Ihrem Gereat und in der Vesorgung beim Anschluss abgeschaltet sind Unsachgemaesse Verdrahtung kann koerperliche Verletzung und an der Ausstattung Schaeden verursachen Vor Wartungsarbeiten am Gerät sind alle Netzkabel vom Stromnetz zu trennen um die Gefahr eines elektrischen Schlages oder andere mögliche Gefahren zu reduzieren ...

Страница 7: ...ack2 HE rectifiers providing a total power output of 8kW Figure 1 Flatpack2 48V 150A System 2B 2L GMT shown About This Guide This manual provides a comprehensive overview of and installation guidelines for the Flatpack2 48V 150A power system Additional information regarding system components may be found in the following documents o 350002 013 User s Guide Flatpack2 Rectifiers o 350003 013 User s ...

Страница 8: ...concrete flooring System Unpacking An individual Flatpack2 48V 150A unit is shipped in a box with protective packing material If pre installed in a cabinet or rack the assembly is wrapped with a shroud of high strength plastic and bolted to a wooden pallet with four anchors Rectifier modules and expansion options are packed in separate cartons Exercise care when unpacking and setting the equipment...

Страница 9: ...Rack Frame Ground Connections are located at rear of the rectifier rack with chassis studs provided in the AC input chamber Refer to the NEC and any local codes practices to determine the appropriate wire size Use of paint penetrating washers abrasive compounds or other means to achieve a reliable frame ground is recommended Converter Shelf Installation If Flatpack DC DC converters are to be insta...

Страница 10: ... 75 To wire the AC input terminal block 1 Remove the cover located at the rear of each rectifier shelf using a Phillips screwdriver two screws 2 Unscrew and remove the green AC connector using a Phillips or flat blade screwdriver 3 Use a small flat blade screwdriver to open each terminal and install AC wiring See the sections Individual Feed on page 11 and Dual Feed on page 11 for wiring details 4...

Страница 11: ...Feed A dual feed shelf is fed by two 2 AC feeds each feed supplies two rectifiers and should have 30A breakers The figure below illustrates the 5 pin AC input connector Termination points for Line 1 Line 2 and Ground are listed in the table at right 10 AWG wire is recommended for each 30A circuit Figure 5 Dual Feed Connector Cover Removed Pin Description 1 Line 2 Rectifier 1 2 2 Line 2 Rectifier 3...

Страница 12: ... If it is not pre installed make required connection to the back of the controller before installing see Section 7 To install modules 1 Release the handles by inserting a small flat blade screwdriver into the release slots and pressing the tip upward extend each handle 2 Slide the module firmly into the shelf 3 Latch the handles to lock the rectifier in place To remove modules 1 Release the handle...

Страница 13: ...for load landings To make cable connections 1 Remove the two screws securing the cover using a Phillips screwdriver 2 Make careful note of the labels for each landing before making connections Do not connect batteries until system turn up 3 Make connections with a maximum 1 AWG cable with two hole lugs having 1 4 diameter holes on 5 8 centers 1 4 20 fastening hardware is provided 4 Torque connecti...

Страница 14: ...nnect LVD contactor can be installed for either battery or load equipment The Configuration label in front of the return bus to the right of the RETURN label describes which of the three LVD configuration options the distribution section contains LVBD battery disconnect LVLD load disconnect or NO LVD Central Office Ground A dedicated central office CO grounding conductor connection is recommended ...

Страница 15: ...s provided for batteries and load equipment The following are common configurations Two Battery Two Load 2B 2L The two leftmost breaker position sets are populated and the rightmost bus set is not installed in the 2B 2L configuration Figure 8 Recommended Return Bus Organization Battery Returns Load Returns CO Ground Battery A Battery B Load 1 Load 2 Returns Battery Load ...

Страница 16: ... block in the rightmost section Two Battery Four Load 2B 4L The 2B 4L configuration populates all six plug in positions As usual the leftmost positions are dedicated to batteries the rest are for load output NOTE Battery breakers turn ON to the left load breakers turn ON to the right Figure 9 Connections to GMT Block Rear View Battery A Battery B Load 1 Load 2 Load 3 Load 4 Batteries Loads 1 2 Loa...

Страница 17: ...turn ON to the right Four Load 12 GMT 4L GMT The 4L GMT configuration changes the two 100A battery breaker positions into 60A load positions by tying them to the internal load bus Two bulk unprotected battery landings are available in the rear of the system see Figure 10 The rightmost position is populated by a GMT fuse block Figure 10 Bulk Battery and Protected Load Landings Six Load 6L This conf...

Страница 18: ...are connected to system alarming so that an open breaker whether tripped or manually placed in the OFF position triggers a Load Distribution Alarm in the Smartpack controller Breakers should be removed from any unused positions to prevent nuisance alarms Single pole circuit breakers rated up to 100A can be installed Each set of positions also accepts a two pole breaker rated up to 175A Plug in Fus...

Страница 19: ...N to the left The other positions have LINE to the left and LOAD to the right the actuator turns ON to the right To install plug in breakers or fuse holders for BATTERY if used 1 Connect the battery alarm wire to the device s normally closed NC alarm pin 2 Orient the LINE and LOAD bullets to the correct bus The battery breaker set next to the Smartpack controller has LINE bus to the right and its ...

Страница 20: ...ttery termination points When viewed from the rear the battery bus landings take up the one of the rightmost positions of the distribution section just to the left of the Smartpack alarm board A label reading BATT appears directly in front of the landings There are two possible configurations for battery connections With breaker positions or without breaker positions If breaker positions are utili...

Страница 21: ...put in the Flatpack2 48V 150A system features a variety of configurations If configured for load output the system can have two four or six load busses The two parallel buses farthest to the left when viewed from the rear of the system can be substituted for a 12 position 65A GMT fuse block ...

Страница 22: ...e end 3 8 2 Press the white terminal clamp above the desired wire location 3 Insert the alarm wire and release the terminal clamp The alarm connector is designed to accept a wire range of 26 AWG solid or stranded to 18 AWG The Form C contacts provided in the system have a rating of 1A at 60 VDC Please refer to the User s Guide Smartpack Monitoring Ctrl Unit for further details of alarm relay desig...

Страница 23: ... and advanced battery discharge monitoring Temperature probes can be provided alone or integrated into the symmetry monitoring cables Rear access to the system controller is required in order to connect a single temperature probe Unlock the Smartpack controller using the same process used for the rectifiers see page 12 Feed the cable through the system as desired through the wiring ports The 15 pi...

Страница 24: ...tions Symmetry capability is facilitated by a symmetry monitoring kit A battery connection board is mounted near the batteries using a bracket The serial port connector DE15 connects the board to either CON3 or CON4 on the rear of the Smartpack controller Up to two battery boards may be installed for each controller In this case temperature probes must connect to the battery connection board one p...

Страница 25: ...ackup Advanced battery monitoring and full symmetry for 2 battery strings Recording of rectifier serial numbers and other information Load shedding control 6 digital inputs for site equipment alarms 6 user defined form C output contacts Smartpack Web Local user interface via a three button keypad on the front panel 2 line x 16 character high contrast backlit LCD display Digital communication with ...

Страница 26: ...ocal user interface via a three button keypad on the front panel 2 line x 16 character high contrast backlit LCD display Digital Communication over CAN bus with each Flatpack2 rectifier Storage of setup parameters alarm configuration and system history in non volatile memory Real time clock with battery backup Advanced battery monitoring and protection Display Modes Status Mode displays the system...

Страница 27: ...ing information o Battery Current o Load Current o Active alarms o Other messages NomVolt BoostVolt LoBattMaj Volt Adjustment LoBattMin HiBattMaj HiBattMin LVBD LVLD 1 1 Volt Calibration VoltCal Change Password Password Set Boost Time Start Stop Boost Auto Boost Conf Enable Disable Threshold Nxt Test Date Time Date Time End Volt Batt Test Setup MaxTestDur Test Int Guard Time Start Stop Test Of Rec...

Страница 28: ... provided must be installed prior to Powersuite Example screen shots Interface with a PC requires a standard A B USB cable To make changes to the settings enter the Service Options menu Default password 0003 The Log In dialog box is displayed by selecting Access Login from the menu pressing the shortcut key F4 or using the Log In button on the toolbar For further info on controller operation and a...

Страница 29: ...Verify AC input voltage is correct Measure and verify 3 Switch ON the external AC feeds 4 Verify all rectifier modules are working Green power LEDs are ON Verify 5 Verify The Smartpack is functioning Green power LED is ON Verify 6 Connect a PC to the PS system Install the PowerSuite software if required 7 Verify DC output voltage Measure and adjust as needed 8 Measure battery voltage confirm level...

Страница 30: ...re com Headquarters Eltek Valere 1303 E Arapaho Rd Richardson TX 75081 USA Phone 1 469 330 9100 Fax 1 469 330 9101 Eltek Valere Gråterudv 8 Pb 2340 Strømsø 3003 Drammen Norway Phone 47 32 20 32 00 Fax 47 32 20 32 10 ...

Отзывы: