EA_Gatekeeper model 2210 Ethernet backhaul

4

The EA_Gatekeeper model 2210 is designed to operate from a 120 VAC to 277 VAC (nominal) power
supply. Power is routed through the AC line power entry gland and the wires land on the screw
terminals located on the bottom side of the SPD module. The screw terminals should be torqued to 6
inch-pounds (0.678 Newton-meters). The cable entry gland dome nut must be torqued to 20 inch-
pounds (2.26 Newton-meters).

To maintain the NEMA 4X integrity to the device, steps must be taken to ensure proper sealing of the
enclosure features. The cable used for the Ethernet communications and for powering the gatekeeper
must be a smooth, round-jacketed, outdoor rated cable. The enclosure lid screws must be installed in
the corners of a lid and torqued to 5 inch-pounds (0.565 Newton-meters). These screws are provided
in the parts bag attached to the inside of the enclosure lid. This product is equipped with an anti-
condensation heater and must configured in the field before mounted on a pole (see “Placing the
EA_Gatekeeper model 2210 into service” on page 5).

The enclosure should not be opened when ambient temperatures fall below 32 °F (0 °C). Opening the
enclosure lid when temperatures are below freezing may result in damage to the enclosure lid gasket
and compromising the seal. If the enclosure must be opened when temperatures are below freezing,
first gently warm the enclosure around the lid gasket to ensure the gasket is not frozen to the sealing
surface.

LAN communications

The gatekeeper supports different antenna options. If the antenna is mounted on the unit itself (that is,
a local external antenna), no additional steps are required when placing the gatekeeper into service.

If the gatekeeper is to be installed at a location that requires a greater height to overcome blocked
signals, a remote antenna is required.

1

Placing the gatekeeper into service requires mounting the

remote external antenna in a suitable location. The antenna should be mounted in the clear, as free
from conductive or metallic obstructions as possible. The connectors should be sealed for
waterproofing.

Do not use a standard RG-8/U cable with solid polyethylene dielectric. The losses in solid dielectric
RG-8/U cables in short distances make solid dielectric RG-8/U cables unacceptable.

For assemblies that use a remote mounted antenna, be sure to waterproof the RF cable terminations
(such as, using coax sealant) to help prevent water entering the cable terminations.

This device has been designed to operate with the antennas listed below and having a maximum
gain of 5.15 dBi. Antennas not included in this list or having a gain greater than 5.15 dBi are strictly
prohibited for use with this device. The required antenna impedance is 50 ohms.

1. Remote antennas and cables are not supplied with this device. Your Honeywell sales engineer can 

help you order the correct antennas and cables.

Содержание EnergyAxis Gatekeeper 2210

Страница 1: ...keeper can be enclosure mounted in different form factors This leaflet explains how to install the gatekeeper model 2210 This model of EA_Gatekeeper is configured for 120 VAC to 277 VAC nominal operation and uses a battery backup for gatekeeper operation if AC power fails at the site The EA_Gatekeeper model 2210 uses a NEMA 4X rated polycarbonate enclosure The gatekeeper supports different mountin...

Страница 2: ...er supply Pb battery charger 6 7 Heater power terminals 8 Heater fuse 9 Thermostat 10 AC power fuses 11 Surge protective device 12 Heater 13 LAN RF filter 14 Enclosure latches lockable 15 Metal enclosure vent 16 3rd party WAN antenna hole plugs 17 Universal mounting bracket 18 LAN antenna Must be field configured May be bulkhead for remote antenna 19 PE ground lug 20 AC cable entry gland 19 19 18 ...

Страница 3: ...lass A compliance statement on page 9 For optimal performance of the LAN antenna Honeywell recommends that the EA_Gatekeeper model 2210 be installed so that the enclosure is at least 5 feet 1 5 meters off the ground Failure to meet the minimum ground clearance can result in degraded performance of the EA_Gatekeeper model 2210 communication within the EnergyAxis or Connexo systems The EA_Gatekeeper...

Страница 4: ...ratures are below freezing first gently warm the enclosure around the lid gasket to ensure the gasket is not frozen to the sealing surface LAN communications The gatekeeper supports different antenna options If the antenna is mounted on the unit itself that is a local external antenna no additional steps are required when placing the gatekeeper into service If the gatekeeper is to be installed at ...

Страница 5: ...ernal Ethernet surge suppressor The external Ethernet device cable is routed through the Ethernet cable gland and connected into the bottom of the Ethernet surge suppressor The cable used must be rated for outdoor use have a minimum CAT 5 rating and have EMI RFI shielding with conductive RJ 45 connectors The cable shielding is connected to ground on the EA_Gatekeeper side and should be left ungrou...

Страница 6: ...ction instructions 120 VAC Figure 3 Connect heater wire 23 to thermostat flag terminal D Using jumper Z connect heater wire 22 and 24 to DIN rail position B Torque the DIN rail terminal screw to 5 inch pounds 0 565 Newton meters 240 277 VAC Figure 4 Heater wire 22 connects to thermostat flag terminal D Heater wire 23 connects to DIN rail terminal C Use jumper Y to make this connection Torque the D...

Страница 7: ...he enclosure 5 If you are using a remote antenna option mount the external antenna and route the cable through the lightning arrestor bulkhead 18 Use coax sealant to waterproof these connections 6 Apply AC power as appropriate for the intended AC power operation Power is applied to the gatekeeper by a cable that enters the enclosure through the base of the unit 20 and connects to the AC line SPD 1...

Страница 8: ...m battery power Off Normal operation AC power is present at the DC power supply battery charger Low battery or battery replacement On With AC power absent this indicates the operational backup battery 3 is critically low and on the verge of failure With AC power present the battery fuse might be faulty or the battery requires service Off Normal operation Battery is within normal parameters and con...

Страница 9: ...nnas located within 20 cm of each other within a final product is not allowed Trademark notices EnergyAxis is a trademark and or registered trademark of Elster Other names may be trademarks and or registered trademarks of their respective owners FCC and Industry Canada Compliance User Information Part 15 105 This equipment has been tested and found to comply with the limits for a Class B digital d...

Страница 10: ...covering all contingencies If further information is required Elster Solutions LLC should be consulted No warranties either expressed or implied including warranties of fitness for a particular purpose or merchantability or warranties arising from the course of dealing or usage of trade are made regarding the information recommendations descriptions warnings and cautions contained herein In no eve...

Отзывы: