background image

General

Within the EnergyAxis

®

and Connexo systems, the EA_Gatekeeper is the intelligent interface between

the EnergyAxis Management System (EA_MS) and Connexo NetSense and the local area network
created by the gatekeeper (referred to as the EA_LAN). As the interface, gatekeepers are equipped with
WAN and LAN communication capabilities. Depending on the need, utilities have options when
choosing how to deploy gatekeepers into service. For example, the gatekeeper can be installed in an
A3 ALPHA

®

meter if revenue metering is required at a particular site. If deploying meter-based

gatekeepers is neither feasible nor desired, the gatekeeper can be enclosure-mounted in different
form factors.

This leaflet explains how to install the gatekeeper model 2210.

This model of EA_Gatekeeper is configured for 120 VAC to 277 VAC (nominal) operation and uses a
battery backup for gatekeeper operation if AC power fails at the site. The EA_Gatekeeper model 2210
uses a NEMA-4X rated polycarbonate enclosure. The gatekeeper supports different mounting options,
including mounting on 18-foot (5-meter) to 35-foot (11-meter) utility poles.

Because of the self-discharge rate of the system backup battery, this product must be powered up
within 60 days of receiving. If the battery drops below 11.25 VDC for an extended period, the battery
might need to be charged with a shop charger or need to be replaced.

EA_Gatekeeper model 2210
Ethernet backhaul

Installation instructions
IL42-5039B

Содержание EnergyAxis Gatekeeper 2210

Страница 1: ...keeper can be enclosure mounted in different form factors This leaflet explains how to install the gatekeeper model 2210 This model of EA_Gatekeeper is configured for 120 VAC to 277 VAC nominal operation and uses a battery backup for gatekeeper operation if AC power fails at the site The EA_Gatekeeper model 2210 uses a NEMA 4X rated polycarbonate enclosure The gatekeeper supports different mountin...

Страница 2: ...er supply Pb battery charger 6 7 Heater power terminals 8 Heater fuse 9 Thermostat 10 AC power fuses 11 Surge protective device 12 Heater 13 LAN RF filter 14 Enclosure latches lockable 15 Metal enclosure vent 16 3rd party WAN antenna hole plugs 17 Universal mounting bracket 18 LAN antenna Must be field configured May be bulkhead for remote antenna 19 PE ground lug 20 AC cable entry gland 19 19 18 ...

Страница 3: ...lass A compliance statement on page 9 For optimal performance of the LAN antenna Honeywell recommends that the EA_Gatekeeper model 2210 be installed so that the enclosure is at least 5 feet 1 5 meters off the ground Failure to meet the minimum ground clearance can result in degraded performance of the EA_Gatekeeper model 2210 communication within the EnergyAxis or Connexo systems The EA_Gatekeeper...

Страница 4: ...ratures are below freezing first gently warm the enclosure around the lid gasket to ensure the gasket is not frozen to the sealing surface LAN communications The gatekeeper supports different antenna options If the antenna is mounted on the unit itself that is a local external antenna no additional steps are required when placing the gatekeeper into service If the gatekeeper is to be installed at ...

Страница 5: ...ernal Ethernet surge suppressor The external Ethernet device cable is routed through the Ethernet cable gland and connected into the bottom of the Ethernet surge suppressor The cable used must be rated for outdoor use have a minimum CAT 5 rating and have EMI RFI shielding with conductive RJ 45 connectors The cable shielding is connected to ground on the EA_Gatekeeper side and should be left ungrou...

Страница 6: ...ction instructions 120 VAC Figure 3 Connect heater wire 23 to thermostat flag terminal D Using jumper Z connect heater wire 22 and 24 to DIN rail position B Torque the DIN rail terminal screw to 5 inch pounds 0 565 Newton meters 240 277 VAC Figure 4 Heater wire 22 connects to thermostat flag terminal D Heater wire 23 connects to DIN rail terminal C Use jumper Y to make this connection Torque the D...

Страница 7: ...he enclosure 5 If you are using a remote antenna option mount the external antenna and route the cable through the lightning arrestor bulkhead 18 Use coax sealant to waterproof these connections 6 Apply AC power as appropriate for the intended AC power operation Power is applied to the gatekeeper by a cable that enters the enclosure through the base of the unit 20 and connects to the AC line SPD 1...

Страница 8: ...m battery power Off Normal operation AC power is present at the DC power supply battery charger Low battery or battery replacement On With AC power absent this indicates the operational backup battery 3 is critically low and on the verge of failure With AC power present the battery fuse might be faulty or the battery requires service Off Normal operation Battery is within normal parameters and con...

Страница 9: ...nnas located within 20 cm of each other within a final product is not allowed Trademark notices EnergyAxis is a trademark and or registered trademark of Elster Other names may be trademarks and or registered trademarks of their respective owners FCC and Industry Canada Compliance User Information Part 15 105 This equipment has been tested and found to comply with the limits for a Class B digital d...

Страница 10: ...covering all contingencies If further information is required Elster Solutions LLC should be consulted No warranties either expressed or implied including warranties of fitness for a particular purpose or merchantability or warranties arising from the course of dealing or usage of trade are made regarding the information recommendations descriptions warnings and cautions contained herein In no eve...

Отзывы: