
IL42-4034D
February 2012
2
WARNING
!
Use authorized utility procedures to install and service metering equipment. Dangerous voltages with high current
capabilities are present. Equipment damage, personal injury, or death can result if safety precautions are not followed.
The AGI RLC polyphase interrupter for use with an A3 ALPHA meter
contains the following items:
■
AGI RLC enclosure assembly
■
optional antenna cable, 3-foot or 10-foot (may be shipped inside enclosure assembly)
■
3-foot or 10-foot service control cable (may be shipped inside enclosure assembly)
1
■
3-foot or 10-foot contactor status cable (may be shipped inside enclosure assembly)
■
Mounting bracket (optional)
■
Mounting bracket installation materials (may be shipped with mounting bracket)
Contact Elster’s support line at +1 800 338 5251 if you do not have all the required materials.
Before you install
WARNING
!
Use authorized utility procedures to install and service metering equipment. Dangerous voltages with high current
capabilities are present. Equipment damage, personal injury, or death can result if safety precautions are not followed.
NOTICE
Be sure to remove power before beginning the installation of the polyphase service control device. Removing the meter
from the socket
does not necessarily
remove power.
Unpack all the materials, and be sure that you have all the components before installing the polyphase service control
device in the field.
Referencing Figure 1, you must attach the mounting bracket to the enclosure using the mounting bracket installation
materials, torquing to 20 foot-pounds (±0.5 foot-pounds). Also, your polyphase service control device may be equipped
with an optional external antenna. If the unit is not using the optional external antenna, the hole seal will be inserted
instead.
1
Cable length is specified at the time of order.