Elster AGI RLC Скачать руководство пользователя страница 10

IL42-4034D

February 2012

10

NOTICE

The meter is shipped with the service control state set to closed and remains closed until commanded to change state. By 
default, when the meter is placed into service, the load will be connected. Using Metercat software version 3.0 or later and 
an optical probe connected to the A3 ALPHA meter, you can control the state of the relay using the Set Interrupt Control 
Relay task. For more information on using Metercat version 3.0 or later and the Set Interrupt Control Relay task, see the 
Metercat user guide or online Help.

Troubleshooting

WARNING

!

Use authorized utility procedures to install and service metering equipment. Dangerous voltages with high current 
capabilities are present. Equipment damage, personal injury, or death can result if safety precautions are not followed.

Under normal operating conditions, the A3 ALPHA meter will be powered and its LCD will be active. You should be able to 
use Metercat 3.0 or later to test the connect and disconnect commands for the AGI RLC polyphase interrupter.

If the external load cannot be turned on, check the following items:

1.

Is the meter LCD active? Is service voltage present? You may need to replace the A3 ALPHA meter.

2.

Is the circuit breaker closed? Reset the circuit breaker if necessary. If you suspect possible damage to the 
transformer, contactor solenoid, or control wiring, contact Elster.

3.

Is the load controllable by the manual switch? If the circuit breaker trips, see item #2. If the contactor pulls in with 
the switch in the manual position, there may be damage to the external load or load wiring.

4.

Using the Set Interrupter Control Relay task in Metercat 3.0 or later, can the external load be controlled?

If Metercat cannot control the load, verify that there is no open circuit in the service control extension cable and 
all its connections. If the control cable circuit is functional, then replace the meter.

If Metercat can control the load, verify that there is no damage to the optional external antenna on the control 
box or coaxial cable and connections between the antenna and meter. If the coaxial cable, connectors, and 
antenna are undamaged, replace the meter.

For information on Metercat and the Set Interrupter Control Relay task, see the Metercat user guide or online Help.

If the external load cannot be turned off, check the following items:

1.

Is the manual switch in the “Local On” position? Set the switch to the “Remote Control” position.

2.

Using the Set Interrupter Control Relay task in Metercat 3.0 or later, can the external load be controlled?

If Metercat cannot control the load, verify that there is no short circuit in the service control extension cable and 
all its connections. If the control cable circuit is functional, replace the meter.

If Metercat can control the load, verify that there is no damage to the optional external antenna on the control 
box or coaxial cable and connectors between the antenna and meter. If the coaxial cable, connectors, and 
antenna are undamaged, replace the meter.

For information on Metercat and the Set Interrupter Control Relay task, see the Metercat user guide or online Help.

If you need technical assistance during installation, call the Elster support line at +1 800 338 5251.

Содержание AGI RLC

Страница 1: ...upled with an A3 ALPHA meter1 equipped with either an EnergyAxis System integrated wireless LAN mesh radio or an integrated wireless WAN option board the AGI RLC can be controlled using the EnergyAxis System Additionally the A3 ALPHA can provide essential metering and monitoring for your remote polyphase loads While the AGI RLC polyphase interrupter can be coupled with another controller such as a...

Страница 2: ...ave all the required materials Before you install WARNING Use authorized utility procedures to install and service metering equipment Dangerous voltages with high current capabilities are present Equipment damage personal injury or death can result if safety precautions are not followed NOTICE Be sure to remove power before beginning the installation of the polyphase service control device Removin...

Страница 3: ...rupter assembly isometric view 120 A version shown 200 A is similar HAZA RD O U S VO LTA GE S ON ELEC TR IC ALCO MPO N E N T S C ANSH O CK BU R N OR C AUSED EATH Antenna Enclosure Back panel optional Hole seal optional Mounting bracket may be shipped separately ...

Страница 4: ... for the source terminals is 60 VA 7 Double pole circuit breaker 8 Manual switch to locally restore service 9 Terminal block with two aux control terminals and two 120 V source terminals 10 Surge protector 11 Control connector 12 Enclosure latch lockable Auxiliary switch for LED control Eaton part number C25HNY5 Part part number subject to change without notice Eaton part number C25KNY9 Part part ...

Страница 5: ...3 LED operation 200 A version shown 120 A version indicators are identical 1 2 CLOSED OPEN 1 Red LED Indicates contactor is closed Power should be present at load 2 Green LED Indicates contactor is open Power should be absent from load ...

Страница 6: ...IL42 4034D February 2012 6 Figure 4 AGI RLC wiring diagram ...

Страница 7: ...GI RLC polyphase interrupter assembly dimensions 120 A version 14 40 0 39 diameter 0 39 diameter 2 50 5 25 13 00 8 20 4 50 3 50 2 inch conduit hole both sides 5 00 3 88 10 11 Approximate dimensions in inches 17 50 16 60 2 inch conduit hole ...

Страница 8: ...LC polyphase interrupter assembly dimensions 200 A version Approximate dimensions in inches 20 00 0 53 diameter 0 53 diameter 11 125 26 50 25 25 2 50 6 75 16 00 5 08 6 00 2 inch conduit hole both sides 2 inch conduit hole 6 96 15 00 4 00 5 50 ...

Страница 9: ... Be sure to always follow your utility s guidelines and practices when installing equipment When installing the AGI RLC use the following recommended procedures as well as your utility s guidelines and practices 1 Mount the enclosure assembly to the pole using your utility s guidelines and practices 2 If using the optional external antenna attach the antenna cable to its connector within the enclo...

Страница 10: ...ch in the manual position there may be damage to the external load or load wiring 4 Using the Set Interrupter Control Relay task in Metercat 3 0 or later can the external load be controlled If Metercat cannot control the load verify that there is no open circuit in the service control extension cable and all its connections If the control cable circuit is functional then replace the meter If Meter...

Страница 11: ...February 2012 IL42 4034D 11 Notes ...

Страница 12: ...usive or covering all con tingencies If further information is required Elster should be consulted No warranties either expressed or implied including warranties of fitness for a particular purpose or merchantability or warranties arising from the course of dealing or usage of trade are made regarding the information recommendations descriptions warnings and cautions contained herein In no event w...

Отзывы: