Page 5
Unvented Cylinder Fitting Instructions
EBP Packages Manual
1) Position the frame in fi nal position, ensuring the frame is up
against the wall at the back of the frame. Secure the frame to the
fl oor and wall using screws through the 8 holes provided. Rest the
cylinder discharge pipe on the cylinder shelf.
Fixing Holes
Cylinder
Location Ring
2) Lift the cylinder on to the frame and push it back to the location
ring on the frame cylinder shelf. Take care not to scratch the shelf.
Note: For lifting purposes please take note of the cylinder weight
detailed in the cylinder manual and add 5kgs for any ancillary
components.
3) Ensure that the front of the cylinder is square with frame. The
immersion heater enclosures should be facing forwards.
Pipe Clip
Discharge Pipe
Hep
V
O Dry Trap
4) Fit lower safety valve discharge pipe into the Hep
V
O dry trap
and secure with pipe clip
5) Fit upper safety valve discharge pipe into the tundish and join
up to lower discharge pipe using 22mm compression coupling
provided. Secure the upper discharge pipe to the cylinder using
the pipe clips provided. Adjust the cylinder as necessary on the
frame and check for leaks.
6) Ensure that all electrical
and metallic components are
earth bonded, a connection
stud is provided on the frame.
The unit is now ready to be piped up.
Pipe Clip
22mm
Compression
Coupling
Tundish
Cylinder
Location Ring
Discharge Pipe
IMPORTANT
The safety discharge pipework from an unvented cylinder must be
suitable to withstand high temperatures circa 100
O
C for prolonged
periods. The installer must ensure that the correct material
specifi cations is used in the discharge pipework and soil stacks
when connecting them to the temperature and pressure relief valve
discharge.
If in doubt please consult Elson Technical.
Содержание Coral Aquanox
Страница 10: ...Page 10 EBP Packages Manual Notes ...
Страница 11: ...Page 11 EBP Packages Manual Notes ...