background image

3

Installation and commissioning

Weather Station Suntracer KNX basic

 • Status: 15.07.2013 • Technical changes reserved. Errors reserved.

The product conforms with the provisions of EC guidelines

EMC Directive 2004/108/EC

Low Voltage Directive 2006/95/EC

The following standards and/or technical specifications have been applied:

EN 50491-5-1: 2010

EN 50491-5-2: 2011

2.

Installation and commissioning

2.1. Installation notes

Installation, testing, operational start-up and troubleshooting should 
only be performed by an electrician.

DANGER!
Risk to life from live voltage (mains voltage)! 

There are unprotected live components within the device.

National legal regulations are to be followed.

Ensure that all lines to be assembled are free of voltage and take
precautions against accidental switching on.

BCU type

Own micro controller

PEI type

0

Group addresses

max. 254

Allocations

max. 255

Communication objects

222

Heating rain sensor

approx. 1.2 W (230 V and 24 V)

Measurement range 
temperature

-40…+80°C

Resolution (temperature)

0.1°C

Accuracy (temperature)

±1°C    at  -10…+85°C
±1.5°C at  -25…+150°C

Measurement range wind

0…70 m/s

Resolution (wind)

<10% of the measured value

Accuracy (wind)

±25% at 0…15 m/s
at an angle of attack of 45°, pole mounting

Measurement range 
brightness

0…150 000 lux

Resolution (brightness)

1 lux     at 0…120 lux
2 lux     at 121…1 046 lux
63 lux   at 1 047…52 363 lux
423 lux at 52 364…150 000 lux

Accuracy (brightness)

±35%

Содержание Suntracer KNX basic Series

Страница 1: ...allation instructions EN Elsner Elektronik GmbH Control and Automation Engineering Herdweg 7 D 75391 Gechingen Phone 49 0 70 56 93 97 0 info elsner elektronik de Germany Fax 49 0 70 56 93 97 20 www el...

Страница 2: ...ot fog or dew If it stops raining or snowing the sensor dries quickly and the precipitation message ends Temperature measurement Switching outputs for all measured and calculated values Threshold valu...

Страница 3: ...components within the device National legal regulations are to be followed Ensure that all lines to be assembled are free of voltage and take precautions against accidental switching on BCU type Own m...

Страница 4: ...ctions 2 1 1 Location Select an assembly location at the building where wind rain and sun may be collected by the sensors unobstructedly Do not assemble any construction components above the weather s...

Страница 5: ...omes with a combination wall pole mount The mount comes adhered by adhesive strips to the rear side of the housing Fasten the mount vertically onto the wall or pole Fig 2 The wind sensor must be mount...

Страница 6: ...eam Example of the use of a mounting arm Due to flexible ball joints the sensor can be brought into ideal position Fig 6 Example use of the hinge arm mounting With the hinge arm mounting the weather s...

Страница 7: ...d carefully so as not to pull off the wire connecting the PCB in the bottom part with the rain sensor in the cover soldered cable connection in case of 230 V AC version cable with plug in case of 24 V...

Страница 8: ...ding under the circuit board and only feed the connector cables up wards through the openings in the circuit board Fig 11 1 Cable connection to the rain sensor in the housing cover 2 Opening for the c...

Страница 9: ...ction to the rain sensor in the housing cover 2 Tension clamp for voltage supply 24 V DC 20 V AC Massive conductors of up to 1 5 mm or conductors with fine wires Terminal configu ration independent fr...

Страница 10: ...he temperature sensor small blank at the bottom part of the housing when mounting the weather station Please also take care not to break away or bend the cable connection between the blank and the rai...

Страница 11: ...nce DANGER There is a risk to life from the live voltage mains voltage If you come into contact with live components in the device e g caused also by a jet of water there is the risk of an electric sh...

Отзывы: