Installation and commissioning

Leakage sensor Leak

 • Version: 03.08.2017 • Errors and technical modifications subject to change without notice.

2.4. Leakage sensor commissioning

1. Connect the probe to the evaluation unit (insert the BNC plug). 
2. Connect the mains supply line to the evaluation unit. Line voltage 230 V AC, 50 Hz.
3. The device is ready for operation.

2.5. Alarm output use

If the alarm output is used, the installation, testing, commissioning and 
troubleshooting of the unit may only be performed by an electrician 
(pursuant to VDE 0100).

DANGER!
Risk to life from live voltage (mains voltage)! 

There are unprotected live electric components inside the device.

Observe the VDE provisions.

Fig. 2 
Probe
1) 3 electrodes on the lower side
2) Connection lead (for evalua-

tion unit)

1

2

Fig. 3 Overview

Evaluation
unit

Probe

The probe stands with all 
the three electrodes on the 
floor

Mains 230 V 
AC, 50 Hz

Evaluation unit beyond 
the reach of water

Содержание Leak

Страница 1: ...installation instructions Item number 30161 EN Elsner Elektronik GmbH Control and Automation Engineering Sohlengrund 16 75395 Ostelsheim Tel 49 0 70 33 30 945 0 info elsner elektronik de Germany Fax...

Страница 2: ...he evaluation unit during a water alarm sustained beeping tone Short beeping during the follow up time 1 minute after the end of the alarm Output for alarm reporting potential free changeover contact...

Страница 3: ...against unintentional use if it can be assumed that risk free operation is no longer guaranteed The device is only to be used for its intended purpose Any improper modification or failure to follow th...

Страница 4: ...o the wall with mounting brackets 2 3 Probe placement The electrode probe is placed on the floor with the contacts facing downwards Ideally the probe should be located in a place that in case of water...

Страница 5: ...output use If the alarm output is used the installation testing commissioning and troubleshooting of the unit may only be performed by an electrician pursuant to VDE 0100 DANGER Risk to life from liv...

Страница 6: ...z 7 The device is ready for operation 3 Behaviour in case of alarm The alarm will be triggered if there is water between the electrodes of the probe for more than 3 seconds If there is no more water c...

Страница 7: ...tact the evaluation unit produces sustained beeping sounds once per second The beeping sounds are shorter during the follow up time 3 2 Output Fig 5 If no alarm is active Contact between NC Normally C...

Отзывы: