background image

User manual & technical documentation – LDC-Q – EN – Rev 1.1 - 20022018

 

22 

 

 

Fault message for installations with break tank 
 

Colour 

 

Report 

Alarm trigger 

Machine 

status 

Necessary 

action 

 

Green 

steady 

In use 

 

 

 

 

Green 

flashing 

Stand-by 

 

 

 

 

Orange 

steady 

Maintenance 

If the pump has 

been active for 

more than 1500 

hours, the 

maintenance 

message will be 

shown. 

Machine 

remains active 

Contact our 

service 

department 

 

Red steady 

Low level break 

tank 

Water is below 

the LLL level 

Pump is 

switched off. 

Filling valve 

remains active 

The tank will 

have to be filled 

up to HL, then 

the installation 

should be 

manually reset. 

If the

fault is still 

active and the 

break tank is 

filled, check the 

level switch.

 

Red 1x 

flashing 

Pump fault 

This fault 

become active 

when the 

thermal 

protection is 

switched off or 

the fault output 

on the pump is 

activated 

Pump is 

switched off. 

Filling valve 

remains active 

Thermal fault 

will have to be 

reset, or fault 

on the pump 

will have to be 

reset. After this, 

reset on the 

installation. 

 

Red 2x 

flashing 

Fault temperature 

water 

Thermostat on 

pump measures 

a temperature 

higher than 70 

°C 

Pump is 

switched off, 

filling valve 

remains active 

Check the water 

supply 

temperature or 

pump tarts too 

often due to 

small leak in the 

system. Reset 

installation. 

 

Red 3x 

flashing 

Break tank filling 

time-out 

If the tank does 

not reach HL 

within a settable 

time (for stopped 

pump), a time-

out alarm will be 

output. 

Filling valve 

and pump are 

switched off. 

Once the 

installation has 

been reset, it 

will start filling 

again. It must 

be checked 

whether the 

valve is opened, 

whether there is 

a water supply, 

and whether the 

HL sensor is 

OPTION: BREAK TANK 

Содержание LDC-Q

Страница 1: ...User manual technical documentation LDC Q EN Rev 1 1 20022018 1 Booster unit LDC Q User Manual and Technical Manual...

Страница 2: ...documentation LDC Q EN Rev 1 1 20022018 2 This user manual applies to the following installations LDC Q 65 20 LDC Q 100 20 LDC Q 130 20 LDC Q 190 20 LDC Q 240 20 Option Option Option Break tank Enclos...

Страница 3: ...sent in the installation This is in order to avoid injury to people and damage to the environment This user manual must be accessible at all times This user manual has been compiled with the greatest...

Страница 4: ...an operating or maintenance instruction can result in danger to people and the environment when not complied with precisely or when not supervised Please follow the instructions and proceed with extr...

Страница 5: ...Do not use the installation after it has been damaged Have it inspected by an authorised machine engineer and repaired when necessary The transfer re location and initial commissioning of the installa...

Страница 6: ...n switch 1 The installation may only be used when the pressurised water connection complies with a complete cleaning set in accordance with the installation specifications These include water lines ho...

Страница 7: ...en the flow sensor emits a no flow signal In both cases the pump then switches to stand by mode Satellite Closed When no cleaning activities are being performed the lever on the Blocksat must be in th...

Страница 8: ...set the lever to the stop position grey 3 Satellite After use After each use the injectors must be flushed through with clean water To do this immerse the chemical suction hose into a basin of clean w...

Страница 9: ...User manual technical documentation LDC Q EN Rev 1 1 20022018 9...

Страница 10: ...the pipework A pressure sensor is also installed on the pressure line The signal from the pressure sensor goes directly to the frequency controller which controls the pump A switch box with main switc...

Страница 11: ...ction year C Voltage frequency D Maximum protection E Weight F Kilowatt G Operating pressure H Operating temperature I Serial number Type of installation LDC Q 65 20 LDC Q 65 20 BREAK TANK LDC Q 100 2...

Страница 12: ...Place the installation level on a stable surface Place the installation in a dry frost free room Should the unit require installation on a wall ensure the wall is strong enough to support the weight o...

Страница 13: ...fecting and white for foaming Ensure that the ends of the intake hoses are immersed completely in the liquid Connect the compressed air supply 12 The compressed air supply must have a constant pressur...

Страница 14: ...1 Grundfos Eye Shows the operating status of the pump 2 Light fields for indication of setpoint 3 Up and down Changes the setpoint 4 Allows radio communication with Grundfos GO and other products of t...

Страница 15: ...e of the terminal box can reach temperatures in excess of 70 C when the pump is running Before maintenance can be performed on the installation ensure that the installation is fully depressurised Safe...

Страница 16: ...e cleaned with a spray This could lead to irreversible damage being caused to the installation The following points are important when cleaning the installation Switch off the main switch and any othe...

Страница 17: ...d optimally to withstand corrosion Damage to the corrosion proof covering caused by e g welding scratches dents etc should be treated with a certified and approved corrosion proof and passivating mate...

Страница 18: ...Stop the pump and shut off the water supply to the installation Set the lever to the foam position white and depressurise the hose and any mounted reel by operating the pistol until no more liquid co...

Страница 19: ...g into the jerry can the non return valve 22 is dirty or damaged Unscrew the non return valve and restriction out of the block and pull them apart as shown in the drawing 24 Clean the parts and check...

Страница 20: ...ould be connected by a professional using the proper tools After maintenance all covers and taps need to be positioned or closed off before the installation is put into operation again Motor bearings...

Страница 21: ...30 55 4000 3000 2000 1500 75 2000 1500 1000 500 Dismantling and removal The proper dismantling removal or scrapping of the installation must always be carried out in the presence of authorised persons...

Страница 22: ...become active when the thermal protection is switched off or the fault output on the pump is activated Pump is switched off Filling valve remains active Thermal fault will have to be reset or fault o...

Страница 23: ...he fault pressure sensor is activated Pump is switched off Filling valve remains active mA signal must return within the 4 20 mA range afterwards reset installation Red 6x flashing Break tank level se...

Страница 24: ...and then call Elpress The system does not suction any agent Control lever is not in position foaming disinfecting Set control lever to position foaming disinfecting Dosing or non return valve blocked...

Страница 25: ...g Check the compressed air line Is the correct lance and nozzle mounted Rinsing Blue lance Foaming White lance Disinfecting Red lance only for RFD The satellite foams or disinfects poorly Is the water...

Страница 26: ...the seal Ensure that the water temperature is not too high and the pump does not become blocked with scale due to hard water The water supply pressure should be checked and must be at least 1 5 bar i...

Страница 27: ...User manual technical documentation LDC Q EN Rev 1 1 20022018 27...

Страница 28: ...A LDC Q 130 20 7 5 kW Break tank Article number 83301132 A LDC Q 130 20 7 5 kW Break tank Enclosure Article number 83301132 A LDC Q 190 20 7 5 kW Article number 83301109 LDC Q 190 20 7 5 kW Enclosure...

Страница 29: ...ox AG Max 5 Alcanios SF 20 Max 5 Aniosticil DS 30 Max 5 Quiecid F60 Max 5 Auicstieul Contact Max 5 When changing chemical the entire installation must first be rinsed with clean water for a period of...

Страница 30: ...e below to see which drawings belong to your installation The drawings can be found at the rear of this user manual LDC Q without break tank LDC Q with break tank LDC Q RF LDC Q RFD Drawing 1 Spare pa...

Страница 31: ...User manual technical documentation LDC Q EN Rev 1 1 20022018 31 Drawing 1...

Страница 32: ...User manual technical documentation LDC Q EN Rev 1 1 20022018 32 Drawing 2...

Страница 33: ...User manual technical documentation LDC Q EN Rev 1 1 20022018 33 Drawing 3...

Страница 34: ...User manual technical documentation LDC Q EN Rev 1 1 20022018 34 Drawing 4...

Страница 35: ...eise vervielf ltigt ver ffentlicht oder auf andere Weise zug nglich gemacht werden Obwohl die in dieser Brosch re enthaltenen Informationen mit gr ter Sorgfalt zusammengestellt wurden k nnen keine Rec...

Страница 36: ...manual technical documentation LDC Q EN Rev 1 1 20022018 36 20022018 Sales E sales elpress nl T 31 485 51 69 69 Service E service elpress nl T 31 485 55 06 56 Elpress bv Handelstraat 21 NL 5831 AV Box...

Отзывы: