5
Technical Support: +44(0)23 9269 6638 (option 3)
PAK200545_03B May 2016 ©2016 ELMDENE INTERNATIONAL LTD
Fold up ‘Tabs’ to locate
battery and secure with
the rubber band supplied
Fold up ‘Tabs’ to locate
battery and secure with the
rubber band supplied
Fig 3 GEN2-18-B
Fig 4 GEN2-08-B
Fig 5 GEN2-18-C
Fig 6 GEN2-08-C
14)
Apply mains power.
Check that Green Mains LED is ON.
Check there is no fault indicated by the Red Fault LED, refer to diagnostic table on page 6.
15)
Disconnect mains power.
Check that the batteries continue to supply voltage and current to the output load.
Check that Green Mains LED is OFF and the control panel displays a Loss of Mains (EPS) fault
NOTE:
Batteries must have sufficient charge to supply the output load
16)
Reconnect mains power.
Check that Green LED is ON.
17)
Remove Output fuse.
Check that Red Fault LED is indicating a fault, refer to diagnostic table on page 6, and that the
control panel shows a General PSU fault.
18)
Replace Output fuse.
Check that Red Fault LED is OFF and General PSU fault has cleared at control panel.
Battery
Battery
Battery
Fold up ‘Tabs’ to locate
battery and secure with
the rubber band supplied
Fold up ‘Tabs’ to locate
battery and secure with
the rubber band supplied
Battery