AM852 Veterinary Anaesthesia machine User’ Manual
2
Contents
ontrol section of anaesthetic system.............................................................7
2.1Anaesthetic control system...................................................................................... 7
2.2Assembly of respiration system...............................................................................9
2.3Exhaust emission................................................................................................... 10
2.4Control Evaporator.................................................................................................11
2.5Instructions for filling the AVDD.......................................................................... 12
4.1Test interval............................................................................................................16
4.2Check the system................................................................................................... 17
4.3Test gas supply pipe...............................................................................................17
4.4Test flowrate control.............................................................................................. 18
4.5Evaporator Installation...........................................................................................19
4.6Test Respiration system......................................................................................... 20
6.1Cleaning and sterilization of Anaesthesia workstation surface............................. 23
6.2Cleaning and sterilization of reusable rubber corrugated tube and manual
breathing bag...............................................................................................................23
6.3Cleaning and sterilization of inspiration and expiratory unidirectional valve.......24
6.4Cleaning and sterilization of absorber................................................................... 24
7.1Maintenance schedule............................................................................................25
7.2Maintenance of anaesthetic evaporator..................................................................25
7.3Maintenance of flowmeter..................................................................................... 26
7.4Maintenance of inspiration and expiratory unidirectional valve........................... 26
8.Trouble shooting............................................................................................27
9. Operation Principle.......................................................................................28
دﯾﯾﺎﻣرﻓ ﮫﻌﺟارﻣ.WWW.ELM-FAN.IRتﯾﺎﺳ ﮫﺑ رﺗﺷﯾﺑ دراوﻣ دوﻠﻧاد یارﺑ
To download more items, go to ELM-FAN.IR