ELLER Hand Hoist PH3; capacity: 0,25t – 20t 

 
ELLER ELPH3 series chain hoist in the capacity ranges of 0,25t-30t have been successfully tested 
and therefore approved for cross hauling up to an angle of 30

°

 
Precondition in such an angled rigging job is, that between the hoist hanging and the load attachment 
point exist a straight line. The hoist top hook must be free to move at angle in direction to the load. As 
soon as the top hook has lack of space to move and is interfering with other parts, bending forces 
occur which normal chain hoist are not made for and which will destroy them. As well as the hoist 
body itself has to hang free in the line of force and has no interfering with parts around it and it is not 
rigged around corners. 
 

Important notes for fleeting/cross-hauling. 

 

Fleeting/cross hauling must be specifically addressed in an appropriate lifting plan. 

 

There must be a full assessment of the risks involving fleeting/cross hauling. 

 

The lifting point used for attachment of the hoist for fleeting/cross hauling must be suited for 

the application. 

 

The user must take into account the reduction in the work load limit. 

 

When cross hauling with a single hoist the user must consider the pendulum effect.  

 

To reduce the risk of the pendulum effect the user should work with two hoists so when one 

hoist lifts the other will slack/loosen. Be aware that each hoist itself should have a SWL equal 
or higher that the load. So when lifting 10 ton with 2 hoists; each hoist must have a SWL of 
min 10 tons. 

 

The user must ensure a correct position in line with the hoists to keep the hand chain operate 

smoothly. 

 

The user must take precautions to ensure that the unloaded side chain will not jam in the main 

unit. 

 

The user must ensure a correct positioning of the hoist in a way that the load is correctly 

applied to the top hook. 

 

With multi falls chain hoists the user must ensure a right positioning to prevent loadchain 

jamming in the block and/or in the bottom hook. 

 

Содержание ELPH3-00250

Страница 1: ...gebruiker moeten deze instructies voor gebruik van de handtakel lezen en begrijpen NOTE Owner and operator must read and understand this instruction manual before using the hand hoist N B Besitzer un...

Страница 2: ...icherheitshinweise 14 IV Montagehinweise vor Inbetriebnahme 14 A Vor Inbetriebnahme 14 B Installation und Pr fung vor jedem Einsatz 15 V Bedienung 15 VI Ketten und Haken 15 VII berlastsicherung 15 VII...

Страница 3: ...3 BIJZONDERE VEILIGHEIDSINSTRUCTIES...

Страница 4: ...of eigenmachtige productverbouwingen laten de garantie vervallen 10 Corrosiegevaar bij permanent contact met ongunstige weersomstandigheden zoals bv hoge vochtigheid of schadelijke milieuomstandighed...

Страница 5: ...roleert Ketting voor inspectie reinigen Lastketting van tijd tot tijd oli n nooit de remschijven oli n of invetten 2 Tijdens het hijsen mag de ketting onder de last niet knakken 3 Ketting op rek en sl...

Страница 6: ...van de takel voor dient geschikt te zijn voor een belasting onder een hoek De gebruiker dient rekening te houden met een mogelijke reductie van de werklast Bij deze manier van hijsen met een enkele t...

Страница 7: ...5 x 15 1 24 5 7 309 114 110 33 22 ELPH3 01000 1 6 x 18 1 30 5 10 8 373 152 139 40 28 ELPH3 01500 1 5 7 9 x 24 2 1 36 16 8 460 190 150 52 33 ELPH3 02000 2 7 9 x 24 2 1 36 17 1 460 190 150 52 33 ELPH3...

Страница 8: ...8 SAFETY INSTRUCTIONS...

Страница 9: ...ed and tightened to ensure that the hoist side plates items 8 and 16 are securely located 12 Always check that hoist suspension points such as construction beams load securing devices mountings cross...

Страница 10: ...load the hand chain is either pulled on the right to lift up or the left to lower down VI Chains and hooks 1 The chains and hooks have to be inspected regularly Clean the chain before inspection and l...

Страница 11: ...g plan There must be a full assessment of the risks involving fleeting cross hauling The lifting point used for attachment of the hoist for fleeting cross hauling must be suited for the application Th...

Страница 12: ...0 5 5 x 15 1 24 5 7 309 114 110 33 22 ELPH3 01000 1 6 x 18 1 30 5 10 8 373 152 139 40 28 ELPH3 01500 1 5 7 9 x 24 2 1 36 16 8 460 190 150 52 33 ELPH3 02000 2 7 9 x 24 2 1 36 17 1 460 190 150 52 33 ELP...

Страница 13: ...13 SICHERHEITSHINWEISE...

Страница 14: ...kundigen pr fen 11 Nichtbeachtung der Anleitung unsachgem er Einsatz Korrosion durch ungen genden Schutz oder eigenst ndige Produktumbauten lassen die Garantie erl schen 12 Korrosionsgefahr bei dauerh...

Страница 15: ...Handkette nach oben oder unten gezogen VI Ketten und Haken 1 Die Ketten und Haken sind wiederkehrenden zu pr fen Kette vor Inspektion reinigen Lastkette von Zeit zu Zeit leicht len Niemals Bremse len...

Страница 16: ...er f r die Befestigung des Hebezeugs verwendet wird muss zum Heben in Ecken von maximal 30 geeignet sein 4 Der Benutzer muss die Reduzierung der Arbeitsbelastung ber cksichtigen 5 Beim Quertransport m...

Страница 17: ...5 x 15 1 24 5 7 309 114 110 33 22 ELPH3 01000 1 6 x 18 1 30 5 10 8 373 152 139 40 28 ELPH3 01500 1 5 7 9 x 24 2 1 36 16 8 460 190 150 52 33 ELPH3 02000 2 7 9 x 24 2 1 36 17 1 460 190 150 52 33 ELPH3...

Страница 18: ...25 5t Caution During maintenance if the hoist is to be operated when the hand chain wheel cover has been removed it is necessary that the locking nuts 1 be refitted and tightened to ensure that the h...

Страница 19: ...ame plate rivet Niet 4 27 Keilbout Split pin Sicherungssplint 1 28 Kroonmoer Nut Kronenmutter 1 29 Handwiel deksel Hand wheel cover Handraddeckel 1 Sets 44 Bovenhaak compleet 30 31 2x 32 2x 33 2x 45 T...

Страница 20: ...20 GB Spare parts NL Onderdelenlijst E Ersatzteile 10t DE...

Страница 21: ...estigung 1 19 Borgkeilbout Split pin Sicherungssplint 1 20 Bouten Anchor bolt Bolzen 1 21 Hijsketting Load chain Lastkette 6 22 Typeplaatje Name plate Typenschild 1 23 Remstuk Brake seat Bremssitz 1 2...

Страница 22: ...End anchor Kettenendbefestigung 1 19 Borgkeilbout Split pin Sicherungssplint 1 20 Bouten Anchor bolt Bolzen 1 21 Hijsketting Load chain Lastkette 28 22 Typeplaatje Name plate Typenschild 1 23 Remstuk...

Страница 23: ...isicoreductie 3155 2003 Indien aan het concept enige veranderingen worden aangebracht vervalt onze verantwoordelijkheid DECLARATION OF CONFORMITY In accordance with 2006 42 EG Guidelines Herewith we L...

Страница 24: ...eise f r einzelnen Tragf higkeiten werden im ERP system von Louis Reyners B V festgehalten entsprechen die folgenden Richtlinien die im Amtsblatt der Europ ischen Union ver ffentlicht sind EC Machine...

Отзывы: