![ELLECI DOGMA 100 Скачать руководство пользователя страница 27](http://html1.mh-extra.com/html/elleci/dogma-100/dogma-100_use-and-maintenance-handbook_2393703027.webp)
27
Drainage connection
Connect the piping system, shown in the picture, to the sewerage system evacuation plant of the room
12. Start-up
13. Operation and instructions for use
FOR PLACEMENT, INSTALLATION AND CONNECTIONS, RELY ON
QUALIFIED, EXPERT PROFESSIONALS
(it is not advisable that these operations be carried out by those
lacking the adequate tools and technical knowledge)
Before starting up the machine, it is necessary to ensure that all the electric groundings are connected to the protective
conductor PE.
Before starting up the machine, ensure that placement, installation and connections have been carried out in accordance
with best working practices, following the instructions indicated in this manual.
Do not risk improvised operation, do not use the Dogma 100 and Dogma 90 before the installation has been checked
and verified by a qualified professional
DAMAGES CAUSED BY :
• INTERVENTIONS BY UNAUTHORIZED, INCOMPETENT INDIVIDUALS
• ERRONEOUS AND/OR RISKY OPERATION NOT FORSEEN IN THIS MANUAL
WILL RESULT INTHE CANCELLATION OF THE WARRANTY CONDITIONS
Once the installation is complete, before using the device, it is advisable to carry out a cycle of filling and emptying the basins
in order to eliminate any residues generated during installation or the manufacturing of the device.
S.I.R. Electronic control panel
S.I.R. Mechanical control panel
Open drains (blue light),
closed drains (red light)
Knob up: drain closed
Knob down: drain open
ATTENTION!
Left S.I.R.
Right S.I.R
Standard siphon installation - included
in the packaging
Installation of reduced size siphon - not
included in the packaging.
variable space
EN
Содержание DOGMA 100
Страница 50: ......