background image

ERPB2-8C, ERPB2-8RAC, ERPBV2-8C, ERPBV2-8RAC, LRPB2-8C, LRPB2-8RAC, ERPB2-8C*2C, ERPB2-8C*3C

ERPB2-8GRNC*A, ERPB2-8GRNRAC*A, LRPB2-8GRNC*A, LRPB2-8GRNRAC*A

Page 4

97924C  (Rev. J - 07/16)

Figure 5 - Upper Panel Installation

Figure 6 - Fountain Installation

Figure 7 - Lower Panel Installation

 5. 

Hang

 the upper panel on the mounting frame hanger. Be

    sure that the panel is engaged with hanger at the top of

    frame before releasing it. Align holes in the panel with holes

    in the mounting frame. Install two (2) #10-24 x 5/8” (16mm)

    screws (Item 11 - Figure 5) in holes and tighten securely.

    

 6. 

Install 

the fountain. Remove the screw (Item 12) from cover 

     plate and slide cover plate (Item 16) toward basin. Mount the 

     fountain to the upper panel and frame with (4) 5/16” x 1” 

     (25mm) bolts (Item 27), brackets (Item 9) and nuts 

     (Item 8) provided. Tighten securely. 

Brackets (Item 9) 

     must be installed as shown to properly support 

     fountains. 

(See Figure 6) 

 7. 

Attach waste tube

 (1-1/4” O.D.) to 1-1/4” O.D. slip

     trap (provided by others).

 8. 

ERPB Models: 

Make connections between remote chiller

     outlet tube and fountain. Outlet port is marked on the chiller

     (1/4” O.D. copper tube). Install a 1/4” x 1/4” tee (provided)

     on the marked chiller outlet port. Insert the 1/4” poly tubing 

     coming from the fountain into the union. Turn on the water 

     supply and check for leaks.

               

CAUTION: 

DO NOT SOLDER tubes inserted

                                 into the strainer as damage to

                                 o-rings may result.

     

LRPB Models: 

Make connections between remote chiller

      outlet tube and fountain. Outlet port is marked on the 

      chiller (1/4” O.D. copper tube). Install a 1/4” x 1/4” tee

      (provided) on the marked chiller outlet port. Insert the 1/4”

      poly tubing coming from the fountain into the union. 

               

CAUTION: 

DO NOT SOLDER tubes inserted

                                 into the strainer as damage to

                                 o-rings may result.

 9. 

These products are designed to operate on 20-105

     PSI supply line pressure. 

If inlet pressure is above

     105 PSI, a pressure regulator must be installed in

      the supply line.

 

              

CAUTION: 

Any damage caused by connecting

                                these products to a supply line with

                                pressure lower than 20 PSI or

                                higher than 105 PSI IS NOT 

                                covered under warranty.

10. 

Make electrical connections to the chiller. 

See

      chiller instructions.

11. 

Check stream height from bubbler. 

Stream height is

      factory set at 35 PSI. If supply pressure varies greatly from

      this, remove push button (Item 3 - Figure 11) and adjust

      the screw on the regulator (Item 4 - Figure 11). To remove 

      push button, remove set screw from bottom of sleeve

      (Item 6). Insert a small punch in screw hole and push up 

     while grasping the push button and pull forward removing

      the push button. Clockwise adjustment will raise stream height 

     and counterclockwise movement will lower stream height. For 

      best adjustment stream should hit basin approximately 6-1/2” 

      from the bubbler. Reassemble push button by pushing in on 

      button until the push button catches in the sleeve. Reinstall 
      the setscrew (Item 6) in the sleeve (Item 17).

12. 

Mount lower panel. 

Loosen the three (3) #10-24 x 5/8”

      (16mm) screws (Item 11 - Figure 6) at frame bottom lip. Slide 

      upper tongue of lower panel under lower edge of already 

      installed upper panel. Tighten previously loosened screws

      securely. (See Figure 7)

 

30

12

11

20, 21, 22, 23

11

24

9

8

View From Rear

16

Содержание SWIRLFLO ERPB2-8C

Страница 1: ...It is common practice to ground electrical hardware such as telephones computers and other devices to available water lines This can however cause electrical feedback in the plumbing circuit which res...

Страница 2: ...B2 8C 3C ERPB2 8GRNC A ERPB2 8GRNRAC A LRPB2 8GRNC A LRPB2 8GRNRAC A Page 2 97924C Rev J 07 16 LEGEND A 1 4 O D Tube Water Outlet Connection B 3 8 O D Tube Water Inlet Connection C 1 1 4 Waste Tube D...

Страница 3: ...ushing it until it reaches a positive stop approximately 3 4 19mm on the marked chiller inlet port Connect building supply line to strainer See Figure 3 Caution DO NOT SOLDER tubes inserted into the s...

Страница 4: ...the chiller 1 4 O D copper tube Install a 1 4 x 1 4 tee provided on the marked chiller outlet port Insert the 1 4 poly tubing coming from the fountain into the union CAUTION DO NOT SOLDER tubes insert...

Страница 5: ...BUBBLER DETAIL NOTE When installing replacement bubbler and pedestal tighten locknut only to hold parts snug in position Do Not Overtighten Basin Figure 8 Bubbler Details 1 or 2 Locknut 10A or 10B Bas...

Страница 6: ...PB2 8RAC ERPB2 8C 2C ERPB2 8C 3C ERPB2 8GRNC A ERPB2 8GRNRAC A LRPB2 8GRNC A LRPB2 8GRNRAC A Page 6 97924C Rev J 07 16 Figure 10 Fountain Body Assembly Figure 11 Push Button Assembly 17 3 3 4 4 4 6 7...

Страница 7: ...Panel Drain Plug 1 1 2 Poly Tubing Cut To Length Kit Tee 1 4 3 Pack Gasket Drain Assy Drain Tailpipe Screw 5 16 18 x 1 00 HHMS PARTS LIST ITEM NO PART NO DESCRIPTION Installation Package The component...

Отзывы: