background image

98010C (Rev. C - 6/08)

EDFPB117FP   EDFPB117RFP   EDFPBVM117FP   EDFPBVM117RFP

3

12"

305mm

MAX. WALL

THICKNESS

7 1/4"

184mm

12 1/8"

307mm

7 1/4"

184mm

12 1/8"

307mm

21 15/16"

557mm

2 7/8"

73mm

14"

356mm

4 3/4"

121mm

14"

356mm

38 1/2"

978mm

27"

686mm

ADA

REQUIREMENT

33 15/16"

862mm

41 11/16"

1059mm

1 5/8"

41mm

1 5/8"

41mm

18 3/8"

467mm

FINISHED FLOOR

5/8"

16mm

21 1/8"

537mm

12"

305mm

MAX. WALL

THICKNESS

2 5/8"

66mm

3 5/8"

91mm

13 3/8"

339mm

EDFPB117FPC ROUGH-IN

LEGEND:
A = 7/8" (22mm) DIA. HOLE FOR WATER SUPPLY TUBE
B = 1-3/4" (44mm) DIA. HOLE FOR WASTE LINE
C = 3/8" (10mm) DIA. SLOTS FOR MOUNTING HANGER BRACKET TO WALL

*Note: All dimensions are taken from the finished floor on the side of the wall
 that the fountain is installed on.

43 1/2"

1105mm

36 1/2"

927mm

37"

940mm

28 3/4"

730mm

29 1/4"

743mm

3 1/4"

82mm

16"

406mm

32"

813mm

6 5/8"

168mm

18 3/4"

476mm

1 1/4"

32mm

1 1/4"

32mm

B

B

A

A

HANGER BRACKET

BACK PANEL

MPW200

MTG. PLT.

C

FINISHED FLOOR

MPW200 MTG. PLT.
REF. SEPARATE
INSTALLATION
INSTRUCTIONS
FOR DETAILS

FIG. 4

Содержание Swirlflo EDFPB117FP

Страница 1: ...N AUTHORIZED SERVICE PERSON FIG 1 NOTE WATER FLOW DIRECTION BUILDING WATER INLET SERVICE STOP NOT FURNISHED 1 4 O D TUBE WATER INLET TO COOLER 3 8 O D UNPLATED COPPER TUBE CONNECT COLD WATER SUPPLY TU...

Страница 2: ...mm 33 15 16 863mm 1 5 8 41mm 1 5 8 41mm 36 1 2 926mm 28 3 4 729mm 27 686mm ADA REQUIREMENT 18 3 8 467mm 5 8 16mm 13 5 16 339mm 21 1 8 537mm 12 305mm MAX WALL THICKNESS 2 5 8 66mm 3 5 8 91mm FIG 3 EDFP...

Страница 3: ...6mm 3 5 8 91mm 13 3 8 339mm EDFPB117FPC ROUGH IN LEGEND A 7 8 22mm DIA HOLE FOR WATER SUPPLY TUBE B 1 3 4 44mm DIA HOLE FOR WASTE LINE C 3 8 10mm DIA SLOTS FOR MOUNTING HANGER BRACKET TO WALL Note All...

Страница 4: ...mm 7 1 4 184mm 12 1 8 307mm EDFPB117RFPC ROUGH IN 28 3 4 730mm 29 1 4 743mm 43 1 2 1105mm 36 1 2 927mm 37 940mm 3 1 4 82mm 16 406mm 32 813mm 6 5 8 168mm 18 3 4 476mm 1 1 4 32mm 1 1 4 32mm FINISHED FLO...

Страница 5: ...le See Fig 6 4 Connect free end of operating cable to the valve operating bracket The end of the cables must be recessed into the indents on the pivot brackets 5 Remove cable free play by adjusting th...

Страница 6: ...17FP EDFPBVM117RFP 6 NOTE When installing replacement bubbler and pedestal tighten nut Item 5 only to hold parts snug in position Do Not Over tighten Bubbler Details VANDAL RESISTANT BUBBLERDETAIL FIG...

Страница 7: ...kt Swirlflow Assy Sleeve Button Swirlflo Basin Swirlflow Lower Shell Fountain Body Cover Plate Button Push Swirlflo Pin Push Button Swirlflo FP Gasket Drain Assy Drain Tailpipe Drain Plug 1 1 2 Poly T...

Отзывы: