Installation: Bottle Filler Mounting
Remove two (2) mounting screws with 5/32” Allen wrench
holding top cover to Bottle Filler. Remove top cover. Note:
do not discard mounting screws; they will be needed to
reinstall top cover. (See Fig. 3)
Remove wall mounting plate from Bottle Filler. Place wall
plate against wall on top of basin. Center the wall plate side
to side with the basin. Mark the six (6) mounting holes with
a pencil (See Fig.1).
Remove wall mounting plate from wall. NOTE: Mounting
plate MUST be supported securely. Add fixture support car
-
rier if wall will not provide adequate support.
Install wall mounting plate to wall using six (6) 7/16” oval
mounting holes (mounting bolts not included) (See Fig. 2).
Use appropriate fasteners for your wall type.
Feed 3/8” water line through hole in tower/basin gasket
(See Fig 4).
Install gasket on bottom of bottle filler tower with gasket
support bracket & (2) screws (See Fig 5).
Feed modular (C-13) end of International Power Cord Set
up through basin hole and hole in gasket, and connect to
Power Inlet on Bottle Filler. Do not plug into electrical outlet.
Feed the purple wire (single units) or the purple and yel-
low wires (two-level units) up through basin hole & hole in
gasket.
For Single Model installations: Attach the purple wire from
cooler to the purple wire on the back of the unit, (Note yel-
low wire is not used).
For Two-Level model installations: Attach the purple and
yellow wires from coolers to the purple and yellow wires on
the back of the unit, purple to purple, yellow to yellow.
Lay Bottle Filler on water cooler basin and cut insulation
from tube even with bottom of gasket, remove this insulation
from the 3/8” tube, but do not discard. Feed the waterline
through the hole on top of water cooler. NOTE: To prevent
scratching the basin, place a towel or soft cloth over the
entire basin when working above it.
1.
2.
5.
3.
4.
7.
6.
8.
9.
10.
Figure 2
Figure 3
Figure 4
Figure 5
Bracket & Screws
11.
F
E
A
B
7/16" X 3/4" OBROUND
(11mm X 19mm) HOLES (6)
C
D
E
9/32"O HOLES
(7mm) (12)
FINISHED FLOOR
L
C
7"
178mm
7"
178mm
17 7/8"
454mm
6 3/8"
162mm
6 3/8"
162mm
2"
51mm
2"
51mm
5 3/4"
146mm
13 15/16"
354mm
17 7/16"
443mm
19"
483mm
28 13/16"
732mm
51 9/16"
1310mm
18 7/8"
479mm
12 1/2"
318mm
31 5/16"
796mm
RIM
HEIGHT
32 7/8"
835mm
ORIFICE
HEIGHT
21 7/8"
556mm
2"
51mm
3 7/8"
98mm
7"
178mm
7"
178mm
28 13/16"
732mm
2"
51mm
2 7/8"
73mm
15"
381mm
27"
686mm
ADA
REQUIREMENT
8 1/16"
205mm
19"
483mm
3 9/16"
90mm
5 7/8"
150mm
3"
77mm
2"
51mm
38 1/2"
979mm
ACTIVATION
SENSOR
HANGER BRACKET
Rough-In: LZS8WSS2K
7/16” BOLT HOLES FOR
FASTENING UNIT TO WALL
UNIT CENTER LINE
TOP COVER
MOUNTING
SCREWS
29
A = Water Mains Supply, 3/8” (9.5mm) O.D. compression outlet of Shut-off Valve (not provided) to be 3” (76mm) from Wall.
B = Waste Outlet, 1-1/4” (31.8mm) O.D. Drain tube terminating 2” (51mm) maximum from wall.
C = 1-1/4” (31.8mm) Trap (not provided).
D = Electrical Mains Supply Outlet, 3-wire in Recessed Box. Must have Ground Fault Circuit Interrupter (GFCI) protection.
E = Ensure proper ventilation by maintaining 6” (152mm) minimum clearance from cabinet louvers to wall.
F = 7/16” (11mm) Bolt holes for fastening unit to wall.