background image

Rev.052114-JA 

www.elitescreens.com 

 

 

 

 
 
 

 

 

 

 

 

 

B. Ceiling Mount (flushed): 

1.

 

Measure  distance  B  (shown  in  Fig.  4)  between  the  holes  on  the  top  of  both  end  caps  with  a         
measuring tape. Mark and then drill the four screw holes on the ceiling.  

2.

 

Insert wall anchors into the four drilled holes on the ceiling and then insert the screws through the 
end cap holes into the anchors and ensure that you tighten the screws without stripping the anchors 
(see Fig. 5). 

3.

 

After hanging the screen on to the affixed screws, use the provided bubble leveler to ensure for a 
levelled installation (see Fig. 6). 

 

 

 

 

 

 

 

C. Ceiling Mount (suspended): 

Hardware required (not included): screw hook, snap link, chain 

1.

 

Measure  distance  C  (shown  in  Fig.  7)  between  the  holes  on  the  top  of  both  end  caps  with  a         
measuring tape. Mark and then drill the screw holes on the ceiling.  

2.

 

Insert  wall  anchors  into  the  drilled  holes  on  the  ceiling  and  then  insert  the  screws  through  the 

chain’s  support  into  the  anchors  and  ensure  that  you  tighten  the  screws  without  stripping  the 
anchors (see Fig. 8). 

3.

 

Attach the chains to the support that was screwed into the ceiling. Attach the end caps of the screen 
to the snap link that are at the bottom of the chains for sustainability (see Fig. 8). 

4.

 

After hanging the screen on to the affixed screws, use the provided bubble leveler to ensure for a 
levelled installation. 

 

 
 
 
 
 
 
 
 

 

Fig.3 

Fig.4 

Fig.5 

Fig.6 

Fig.7 

Screw hook 

Snap link 

Fig.8 

2. If the bubble is in the center, the screen is balanced. 

1. If the bubble runs to the right side, the screen is not

 balanced.

 

Отзывы: