![Elite Screens isf CineWhite UHD-B Sable Frame B2 Series Скачать руководство пользователя страница 2](http://html1.mh-extra.com/html/elite-screens/isf-cinewhite-uhd-b-sable-frame-b2-series/isf-cinewhite-uhd-b-sable-frame-b2-series_user-manual_2390269002.webp)
REV040819BR-Z
www.elitescreens.com
2
Note: Additional spare parts may be included.
Assembly
Step 1.
Place a soft-clean cloth on the ground or other flat surface of the area where the screen will be assembled.
Step 2.
Position the pieces of the frame face-down on the soft-clean cloth in the arrangement shown below.
Step 3.
Insert the
Center Joint (A) connector
into
one-half of the Horizontal Frame (B)
and fasten with two
Large Screws and Washers (D).
Once secure, connect with the
one-half of the Horizontal Frame (C)
and fasten with two
Large Screws and Washers (D). Repeat steps for the
other one-half of Horizontal Frames (B) and (C).
Step 4.
Insert the
Elbow Joints (C)
to top and bottom sections of the
Vertical Frame (A)
. Once inserted, secure the
Elbow Joints (C)
by fastening
them with the
Large Screws and Washers (D)
and connect the
Vertical Frame
sections to the
Horizontal Frame
sections. Make sure all corner
frames pieces are flush (no gaps). They should form perfect right angles.
Do not tighten the Screws firmly until all frame pieces are assembled correctly.
Item
Parts List
100”
Screen
110”
Screen
120”
Screen
135”
Screen
150”
Screen
A.
Center Joints
2
2
2
2
2
B.
Springs
54
56
58
62
68
C.
Elbow Joints
4
4
4
4
4
D.
Large Screw/Washer/Small Screw
32/32/4
32/32/4
32/32/4
32/32/4
32/32/4
E.
Pull Hook
1
1
1
1
1
F.
Wall Bracket
2
2
2
2
2
G.
Drywall anchor/Screw/Washer
4/4/4
4/4/4
4/4/4
4/4/4
4/4/4
H.
Short/Long Tension Rods
2/4
2/4
2/4
2/4
2/4
I.
Center Support Bar
1
1
1
1
1
J.
Tension Rod Cap
8
8
8
8
8
Note: You may have to loosen and adjust the brackets and frame pieces. It will help to leave the screws loose until perfect right angles
are formed, then tighten the screws securely.