Rev.060116-D
5
Installation Instructions
The Evanesce B allows access for above or below ceiling installation. Please follow the instructions
described in the following steps below for your type of installation.
Power
The Evanesce B Series includes a 3-Prong
Power Cord (2-Prong Power Cord for some
countries) for use in a non-concealed power
outlet. If your installation will be entirely
concealed (including power outlet), Elite
Screens strongly recommends a hardwire
connection. Please refer to the image below
for both 110v & 220v wiring information.
A.
Above Ceiling Installation Instructions
Assembly
1.
Place the
hanging bracket
(A) over the left and right side ends of the housing and secure each
one using the
M8x40mmhex screw
(G),
M8x16mmx1.5mm washers
(C) and
M8 nut
(E) as
shown below.
Hanging Bracket
(A)
G
C
E