Elite Screens aeonclr series Скачать руководство пользователя страница 9

042717DR 

www.elitescreens.com 

   

 

 

 

 

 

 

 

 

 

 

 

 

4.

 

After the bezel trim has been installed, place a 

corner sleeve

 

(M) 

on all four corners. Begin by aligning and 

adjusting the corner sleeve through the front of the screen. Make sure the corner sleeve completely wraps the edge 

of the bezel trim. This should cover any corner gaps. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Once all corner sleeves have been snapped into each corner of the frame, it is ready to be wall installation. 

 
Diagonal Size Note 

The Diagonal Size of the AR100H-CLR before and after installing the edge trim strip. 

 

 

 

 

 

 

 

Before installing the trim strip 

After installing the trim strip 

 

Front side 

Back side 

The 

front side 

of the frame with trim pieces attached.

 

A     

Corner gap 

will be 

covered by 

the 

corner 

sleeve (M).

 

 

Figure 3

 

White area 

signifies 

corner gap. 

 

Содержание aeonclr series

Страница 1: ...ipe the screen up and down or in a circular motion Wipe from left to right only 2 Please clean the dust on the screen surface with a soft brush or microfiber cloth rough towel or cloth may damage the...

Страница 2: ...9 pcs K Black Tape x1 bag L Bezel trim x6 pcs M Corner sleeve x4 pcs N White gloves x2 pcs Frame Assembly 1 Insert the center joint into one of the horizontal frames and fasten it with the two M5x15...

Страница 3: ...e all four corners are properly in place to form a perfect square Then fasten the four angles with the M5x15 Screws G Horizontal Long frame B Four corners join correctly to form a perfect rectangle Us...

Страница 4: ...ut a small flat weighted object at the edge PVC Velcro end to prevent it from moving out of place Please keep the front of the material face down 2 It is strongly recommended for two people to unroll...

Страница 5: ...Velcro connection and repeat the above steps so the frame is not exposed 7 Proceed to attach the rest of the material to the frame as described in the illustrations below Note Represents the screen ma...

Страница 6: ...he Velcro connections on the corners Lay the Velcro end on the screen material over the Velcro end of the frame and keep it within the edge Proceed in the following sequence Attach in the following se...

Страница 7: ...the hole on each end of the support bar with the M6 hex screws on the top and bottom frames Then fasten with the M6x12 screws Pull back the screen material from the Velcro connection along the edges o...

Страница 8: ...be positioned on the bottom right Refer to Figure 2 below for a visual reference NOTE Make sure the bottom edge trim with the Elite Screens logo is installed on the correct side The back of the materi...

Страница 9: ...uld cover any corner gaps Once all corner sleeves have been snapped into each corner of the frame it is ready to be wall installation Diagonal Size Note The Diagonal Size of the AR100H CLR before and...

Страница 10: ...ojectors as illustrated in example 1 below Overhead placement or a standard projector will make the image very dark on account of the screen s absorbent layer deflecting light that is not aligned with...

Страница 11: ...2 3 the length of the horizontal frame 2 The installation height must be based on your projector s throw height and the distance between your projector and the screen since this screen is just for Ult...

Отзывы: