Elite Screens AEON series Скачать руководство пользователя страница 6

04202021JA    SN 211M +                                    

www.elitescreens.com

                        

U-00197 

6

 

Correct material installation

 –Corners of the screen material are properly wrapped around the corner edges of the 

frame and material is evenly tensioned and flat, creating a nicely taut surface. 

Incorrect material installation

 –The corners of the screen material are not properly wrapped along the edge of the 

frame leaving the material with unbalanced tension and an uneven finish. To correct, detach springs from material at 
the corner(s) where material does not lie flat along the edge of the frame, reposition the material so that it lies flat 
and wraps along the edge of the frame, and reattach springs to the material. 

Note: 

Please make note of the yellow label and spring in the center of the frame.  This is an indicator to start the 

screen material installation process from the middle area of the frame. 

How to avoid getting ripples on the screen’s material surface

  

Solution:

 

Pull and smooth out the material using your hand from the center to the corners, creating a nicely taut 

surface as shown below

 

 

 

 

 

 
Edge Trim Installation 

ATTENTION: THE TOP EDGE TRIM PIECE WITH THE LOGO SHOULD BE INSTALLED ON THE TOP. 

Step 11

: Place the edge trim frame pieces over each end of the frame.  

 

 

 

 

 

 

Connect edge trim frames (

e/f

) together using the 

M4

 

center joint (e) 

and secure with four of the 

M4x4 screws (m)

 

as show in 

Step 1

. Repeat for other side. 

Once both top and bottom edge trim frames have been connected, attach the vertical (left/right) sides edge trim 

frames (

d

) using the 

elbow joints

 (

f

) and secure with four 

M4x4 screws 

(

m

) on all corners, 

Step 2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

e. 

m

1

 

2

 

2

 

2

 

2

 

f. 

Содержание AEON series

Страница 1: ...urate colors in a light controlled environment as the director intended In order for the CineWhite UHD B to maintain its projection qualities and optimum performance please refer to the list below for proper maintenance and cleaning Use a dry microfiber cloth to remove dust from the screen s surface When cleaning use a damp microfiber cloth with warm water to remove any marks Never rub or apply pr...

Страница 2: ... 4 e Side cover Center Joints M4 2 2 2 2 2 2 2 2 2 f Side cover Elbow Joints M4 4 4 4 4 4 4 4 2 2 g M4x7 Screws 24 24 24 24 24 24 24 24 24 h Spring 52 56 66 68 72 78 84 104 112 i Spring Hook 2 2 2 2 2 2 2 2 2 j wall brackets 4 4 4 4 4 4 4 6 6 k Φ5x50 Wall Screws 8 8 8 8 8 8 8 12 12 l Hollow Wall anchors 8 8 8 8 8 8 8 12 12 m M4x4 Screws 24 24 24 24 24 24 24 24 24 n Angle cover 4 4 4 4 4 4 4 4 4 o ...

Страница 3: ...rtical sections to the horizontal frame sections Make sure all holes are in alignment and the frame pieces are flush no gaps They should form perfect right angles Tip The elbow joint d with the larger diameter holes should be on top Step 5 Secure the elbow joints by fastening them with M4x7 screws g 4 at each corner Screen Material Step 6 Put on the white gloves p and carefully unroll the screen m...

Страница 4: ...ort Bar Step 9 Insert the Center Support Bar o into the upper top groove on the back of the frame with the bottom end near the approximate center point of the frame and rotate it in at an angle so that both ends of the bar are in alignment with the groove Make sure the frame corners are positioned in the marked areas of the material Back Side c r Red tips c Back Side Back Side Back Side c c c c c ...

Страница 5: ...th horizontal top bottom sides steps 3 4 Once all center points have been secured make sure the screen material is still within the marked areas before proceeding to attach the next springs Continue attaching the rest of the springs to the material in the following order in steps 5 12 Note after all springs have been attached 5 6 7 8 9 11 10 12 To avoid ripples forming in the material it is impera...

Страница 6: ...the yellow label and spring in the center of the frame This is an indicator to start the screen material installation process from the middle area of the frame How to avoid getting ripples on the screen s material surface Solution Pull and smooth out the material using your hand from the center to the corners creating a nicely taut surface as shown below Edge Trim Installation ATTENTION THE TOP ED...

Страница 7: ...led holes on the installation location and screw them in using a Phillips screwdriver If not installing into a structural wood stud use a hollow wall anchor then screw in the M5x50 wood screws with a screwdriver Make sure the brackets are leveled Model Size X Wall bracket distance X1 Bracket hole distance Y Top Bottom Wall Bracket Height 92 1100mm 43 30 30mm 1 18 980mm 38 58 100 1200mm 47 24 30mm ...

Страница 8: ...30mm 1 18 1520mm 59 84 150 1600mm 62 99 30mm 1 18 1710mm 67 32 Model Size X Wall bracket distance X1 Bracket hole distance Y Top Bottom Wall Bracket Height 180 1000mm 39 37 30mm 1 18 2080mm 81 88 200 1100mm 43 30 30mm 1 18 2330mm 91 73 Don t lock the screw to the bottom Diagonal Models above 150 require 6 x wall brackets For Technical Support or an Elite Screens contact in your area visit www elit...

Отзывы: