background image

Rev.08232021JA                                                

www.elitescreens.com

                        

U-00235 

1

 

 

Aeon 

CineWhite

®

 A8K

 Series 

EDGE FREE

®

 Acoustically Transparent Fixed Frame Screen

 

USER’S GUIDE 

M Type 

 

 

 

 

Product Description: 

 

The 

Aeon Series 

is a fixed frame projection screen that uses Elite’s EDGE FREE® technology. The EDGE FREE® 

design resembles a giant size flat panel TV display. The 

Aeon 

includes a bezel trim to further enhance the frame 

appearance and absorb projector overshoot. An optional LED kit is available for backlighting. 

 

The screen material included is our 

ISF Certified 

CineWhite

®

 A8K.

 

which has an ultra-fine projection surface that 

is  acoustically  transparent  for  front  projection.  It  is  precisely  formulated  for  high-resolution  projectors  to 

offer 

accurate color fidelity

 but also designed to allow speaker placement behind the screen while its bonded black backing 

reduces light loss to enhance contrast.

 

 

In order for the 

CineWhite

®

 A8K

 to maintain its projection qualities and optimum performance please refer to the list 

below for proper maintenance and cleaning. 

 

 

Use a soft bristle brush to spot clean for dust.  

 

Dip a soft bristle toothbrush in mild soap and water to clean light stains.  

 

Never rub or apply pressure when cleaning the surface.  

 

Never attempt to use any solutions, chemicals or abrasive cleaners on the screen surface.  

 

To avoid damaging the screen, avoid touching it directly with your fingers, pens/pencils or any other sharp or 
abrasive objects.

 

 

 

 

 

 

 

 

Содержание Aeon CineWhite A8K Series

Страница 1: ...ransparent for front projection It is precisely formulated for high resolution projectors to offer accurate color fidelity but also designed to allow speaker placement behind the screen while its bonded black backing reduces light loss to enhance contrast In order for the CineWhite A8K to maintain its projection qualities and optimum performance please refer to the list below for proper maintenanc...

Страница 2: ...rim Parts List Qty item 2 pcs Main Frame Parts Qty item 2 pcs Edge Trim Parts Part A vertical frame Part D Part B horizontal frame Part E Part C horizontal frame Part F 2 Hardware Parts List a M4 4 b D5 4 c M4 4 d D5 4 e M4 4 f M4 4 g h i j k l m n o p q r Red Black ...

Страница 3: ...sections Make sure all holes are in alignment and the frame pieces are flush no gaps They should form perfect right angles Tip The elbow joint d with the larger diameter holes should be on top Item Parts List 103 123 135 150 a Center Joints M4 bottom position 2 2 2 2 b Center Joints D5 top position 2 2 2 2 c Elbow Joints M4 bottom position 4 4 4 4 d Elbow Joints D5 top position 4 4 4 4 e Side cove...

Страница 4: ...leeves according to their corresponding lengths on each edge of the screen as shown below The short rods top bottom will overlap to secure a firm grasp in the middle areas Step 8 Carefully and gently place the assembled frame on top of the screen material in the marked areas as shown below Make sure to not allow the angle edge of the frame to come in direct contact with the screen material to avoi...

Страница 5: ... the groove of the frame use the spring hook h to attach the spring to the hole located on the screen material s outer edge in the following order Begin by first attaching the center points on both vertical left right sides steps 1 2 Then the center points on both horizontal top bottom sides steps 3 4 Once all center points have been secured make sure the screen material is still within the marked...

Страница 6: ...so that it lies flat and wraps along the edge of the frame and reattach springs to the material Note Please make note of the yellow label and spring in the center of the frame This is an indicator to start the screen material installation process from the middle area of the frame How to avoid getting ripples on the screen s material surface Solution Pull and smooth out the material using your hand...

Страница 7: ...d attach the vertical left right sides edge trim frames d using the elbow joints f and secure with four M4x4 screws m on all corners Step 2 Step 12 Install the angle cover n on each corner of the frame using the M4x4 screws m Note The angle cover screws holes align with the screw holes on the elbow joint Step 13 Install the springs q in each middle area to further support the bezel trim edge frame...

Страница 8: ...s with a screwdriver Make sure the brackets are leveled Step 15 Position the fixed frame screen onto the top wall brackets as shown below and push down at the center of the top of the frame to secure For Technical Support or an Elite Screens contact in your area visit www elitescreens com Model Size X Wall bracket distance X1 Bracket hole distance Y Top Bottom Wall Bracket Height AR103H 1200mm 47 ...

Отзывы: