Elite ProAV Presenter Pro CLR 2 Скачать руководство пользователя страница 6

Rev.08012022JA 

www.eliteproav.com

 

IMPROPER PROJECTOR PLACEMENT

 

Overhead placement or a 

standard projector will make the image very dark, on account of the screen’s 

absorbent layer deflecting light that is not aligned with its reflective angle. 

 

1) Ceiling Mounted Ultra-Short Throw Projector Illustration 

  

 
 
 

 
 
 
 
 
 
 
 
 
 
 
 

2) Ceiling Mounted Short and Standard-Throw Projector Illustration 
 

 

 
 
 
 
 
 
 

 
 
 

 
 
Note: Images are not up to scale and are for illustrations purposes only

 

 

 
 

Screen Disassembly 

TWO PEOPLE REQUIRED 

1.

 

Lay the protective foam sheet on a clean surface and unhinge the front of each leg, then SLOWLY 

lower the screen down on the foam sheet.   

NOTE: Front side of the material should be facing down on the protect foam sheet. 

2.

 

Once the screen is laid out on the protective foam sheet, unscrew all the knob screws on each side of the 

frame to remove the legs. 
 
3. Next, turn over the screen so the front is facing up. 

 
 
 
 
 

C

LR

®

 2

 S

cr

e

e

n

 Ma

ter

ia

C

LR

®

 2

 S

cr

ee

n

 Ma

ter

ia

Содержание Presenter Pro CLR 2

Страница 1: ...tions below to properly maintain the screen 1 Clean the dust on the screen surface with a soft brush or microfiber cloth 3 Gently wipe the screen with a lightly moistened white lint free cloth with wa...

Страница 2: ...olding legs x2 C Screen material bag x1 D Projection screen material x1 E Protective foam sheet x 1 and pair of gloves x 1 F Carrying Bag x1 G Knob screw x10 H Skirt Note The parts list above is subje...

Страница 3: ...attaching the material from the corners in the following sequence Fig 11 9 After all the corners have been attached continue snapping the buttons on the top bottom of the frame studs Fig 12 13 10 Last...

Страница 4: ...be set at various height intervals 14 Lay the legs over on the back of the frame in the position desired Once you have aligned the leg s holes with the frame s holes secure with the knob screws G 15 N...

Страница 5: ...press stub 2 Snap the bottom of the material to the frame 3 Repeat procedure until finished Notice to Installer PROPER PROJECTOR PLACEMENT The CLR 2 is exclusively for tabletop bottom mounted ultra an...

Страница 6: ...ation Note Images are not up to scale and are for illustrations purposes only Screen Disassembly TWO PEOPLE REQUIRED 1 Lay the protective foam sheet on a clean surface and unhinge the front of each le...

Страница 7: ...oid damaging the material 5 Each person grabs each corner pull tab and lift the material carefully not allowing the material to sag in the middle but assuring it is pulled so it can be flat 6 Then lay...

Страница 8: ...be put the end caps back on to secure the material 10 Unlatch the hinged support bars in each corner of the folding frame A 11 Press in the locking buttons near the folding joints and slowly gather th...

Отзывы: