8.Line up the slotted holes at the end of the ridge with the bolt slots, in the corner bars and push the
two bolts, previously inserted during the gable end assembly, into the slots. Put on nut and tighten.
9.
The roof bars can now be attached to the ridge and gutter. Attach them to the ridge first by
sliding a bolt into the bolt slot of the glazing bar, inserting it through the hole in the flange of the
ridge. Put a nut on and tighten up. Do the same with the rest of the roof bars.
10. Before bolting the bottom of the roof bar to the flange of the eave bar, insert final nut and bolt
to the eave bar as illustrated.
Where the vent is to be positioned put an extra one bolt per bar i.e. the vent covers two glazing bars
so two extra bolts per vent.
(Key Point
). One each bar.
Содержание iGrow
Страница 1: ......
Страница 2: ......
Страница 3: ......
Страница 8: ...SIDE FRAME ASSEMBLY...
Страница 12: ...DOOR END ASSEMBLY viewed from inside...
Страница 16: ...ASSEMBLY OF GREENHOUSE UNIT...
Страница 23: ......
Страница 24: ...ELITE 1303...